Study of Rescheduling of MV Alfa Trans Satu Ship Repair Using Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT)
Abstract
The ship repair project must work according to the schedule agreed in the work contract. However, in the process there are often delays between the initial plan and work in the field. The scheduling method is one of the influences on the success of repairs in order to produce efficient scheduling and cost planning. Based on these conditions, this study aims to obtain a new duration and the most optimal cost of crashing through an alternative, namely additional working hours (overtime hours) and additional workforce in the MV Alfa Trans Satu Ship repair project by applying the CPM and PERT methods. Based on the crash duration calculation using the CPM, the most effective and efficient alternative that can be used to accelerate the MV Alfa Trans Satu Ship repair project is by adding a workforce of 32 Person (an increase of 30% from the initial workforce). This acceleration alternative produces a duration below the normal duration, 21 days from the initial 25 days. The probability of success for this project using the PERT method can be completed within 21 days of 98.46%. The percentage increase in costs is only 4% of the normal for critical work, IDR 50,800,000.
Keywords
Full Text:
PDFReferences
A. A. Rahmi, I. P. Mulyatno, and U. Budiarto, “Optimalisasi Repair Schedule SPOB. Prosper Three 3537 DWT Dengan Critical Path Method Guna Antisipasi Keterlambatan Proyek,” J. Tek. Perkapalan, vol. 8, no. 2, pp. 214–221, 2020. (in Bahasa)
H. Ivandri, I. P. Mulyatno, and Kiryanto, “Analisa Reschedule Repair Kapal Survey Geomarin - III 649 DWT Dengan Menggunakan Critical Path Method,” J. Tek. Perkapalan, vol. 5, no. 4, p. 785, 2017. (in Bahasa)
A. C. Armela, W. Amiruddin, and E. S. Hadi, “Implementasi Project Evaluation and Review Technique ( PERT ) Pada Penjadwalan Reparasi Kapal KMP Royal Nusantara,” J. Tek. Perkapalan, vol. 10, no. 2, pp. 68–76, 2022. (in Bahasa)
L. O. Oktafiana and I. Baroroh, “Comparative Analysis of CPM, PDM and PERT Methods in Ship Repair Scheduling Planning KN. RB 309 Ternate 01,” Berk. Sainstek, vol. 10, no. 3, p. 162, 2022.
A. B. Sulistyo, I. Rifki, and P. Gautama, “Evaluasi Proyek Fabrikasi Matarbari Unit-02 Dengan Metode CPM Dan PERT PT. Dui Esa Unggul,” vol. 5, no. 1, pp. 14–27, 2022. (in Bahasa)
M. F. K. Amrullah, U. Budiarto, and A. F. Zakki, “Penjadwalan Proyek Reparasi Kapal Tugboat Selat Legundi II – 206 Dengan Metode Time Cost Trade-Off (TCTO) dan Project Evaluation And Review Technique (PERT),” Tek. Perkapalan, vol. XX, no. 3, pp. 368–374, 2020. (in Bahasa)
N. Sa’adah, E. Iqrammah, and T. Rijanto, “Evaluasi Proyek Pembangunan Gedung Stroke Center (Paviliun Flamboyan) Menggunakan Metode Critical Path Method (CPM) Dan Crashing,” Publ. Ris. Orientasi Tek. Sipil, vol. 3, no. 2, pp. 55–62, 2022, doi: 10.26740/proteksi.v3n2.p55-62. (in Bahasa)
S. Anggriawan and Iskandar, “Analisa Network Planning Reparasi KM Tonasa Line VIII Dengan Metode CPM Untuk Mengantisipasi Keterlambatan Penyelesaian Reparasi (Studi Kasus di PT. Dok dan Perkapalan Surabaya),” J. Tek. Mesin, vol. 3, no. 3, pp. 106–111, 2015. (in Bahasa)
R. Sekarayu, W. L. Dhanistha, and S. Suntoyo, “Analisis Penjadwalan Kegiatan Pengerukan pada Proyek Pembangunan Pelabuhan Bias Munjul,” J. Tek. ITS, vol. 11, no. 3, 2022, doi: 10.12962/j23373539.v11i3.88509. (in Bahasa)
I. S. Hutomo and M. A. Rohman, “Penjadwalan Probabilistik pada Proyek Jalur Lintas Selatan LOT. 6,” J. Tek. ITS, vol. 10, no. 2, pp. 202–209, 2021, doi: 10.12962/j23373539.v10i2.74300. (in Bahasa)
A. Husen, “lr. Abrar Husen, MT,” vol. edisi revi, no. manajemen proyek, p. 253, 2011. (in Bahasa)
I. Soeharto, Manajemen Proyek. 1997. (in Bahasa)
Fachrurrazi and S. Husin, “Practical crash duration estimation for project schedule activities,” J. King Saud Univ. - Eng. Sci., vol. 33, no. 1, pp. 1–14, 2021, doi: 10.1016/j.jksues.2019.09.005.
Indonesia, Peraturan Pemerintah Republik Indonesia Nomor 35 Tahun 2021 Tentang Perjanjian Kerja Waktu Tertentu, Alih Daya, Waktu Kerja dan Waktu Istirahat, dan Pemutusan Hubungan Kerja. 2021. (in Bahasa)
R. Rosalinda, N. Nizmah, S. Ari R, M. Makmur, and D. Rarasanti, “Analysis of Project Time and Cost Control With Cpm, Pert and Crashing Project Methods in Shop Building Projects At Cv. Mentari Permai,” Sci. J. Reflect. Econ. Accounting, Manag. Bus., vol. 6, no. 1, pp. 85–94, 2023, doi: 10.37481/sjr.v6i1.622.
DOI: http://dx.doi.org/10.12962/j25481479.v8i4.19043
Refbacks
- There are currently no refbacks.
| |||
|
|
|
|
P-ISSN: 2541-5972
E-ISSN: 2548-1479
IJMEIR journal published by Department of Marine Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember Surabaya Indonesia under licenced Creative Commons Attribution-ShareAlike 4.0 International Licence. Based on https://iptek.its.ac.id/index.php/ijmeir/