Risk Evaluation of Ship Repair Delays with The Failure Modes and Effects Analysis (FMEA) Method
Abstract
Every ship, that is still actively operating in shipping must pay attention to repair or maintenance in accordance with classification standards. This was needed by management or ship owners to carry out maintenance planning. The shipyards as repair services, there are often obstacles during the repair process that cause the repair time to be longer. This is caused by limited work equipment, delivery of materials that are not in order, and lack of technical equipment. The purpose of research is to evaluate the risk of ship repair delays so there are no failures or delays in ship repair. The method used is the FMEA method (Failure Mode and Effect Analysis) to measure each failure in each activity that affects ship repair. The results showed an assessment score in the form of a Risk Priority Number (RPN) consisting of activities: amount of cutting machines is still limited with a score of 309.83, painting and welding failures at the same time with a score of 267.08, materials that come are remachined to fit the needs with a score of 335.06 and inadequate transportation equipment with a score of 294.16. Improvements made in the form of preparing amount of work tools before the work is carried out, conditioning the order of work according to the schedule and adding backup transportation.
Keywords
Full Text:
PDFReferences
Alijoyo, A., Wijaya, Q. B., & Jacob, I. (2020). Failure Mode Effect Analysis Analisis Modus Kegagalan dan Dampak RISK EVALUATION RISK ANALYSIS: Consequences Probability Level of Risk. www.lspmks.co.id
Ariany, Z., Pitana, T., & Vanany, I. (2023). Risk Assessment Of New Ferry Ship Construction In Indonesia Using The Failure Mode Effect And Analysis (FMEA) METHOD. Journal of Applied Engineering Science, 1–12. https://doi.org/10.5937/jaes0-43711
Baroroh, I., Ariana, I. M., & Dinariyana, A. A. B. (2022). Risk Analysis of Engine Room Module Installation with Integration of Bayesian Network and System Dynamics. International Review of Mechanical Engineering, 16(6), 299–308. https://doi.org/10.15866/ireme.v16i6.22456
Baroroh, I., Setiawan, G. V., Azhar, A., Hardianto, D., & Widodo, A. B. (2023.). Risk Analysis of Delay in Ship Repair KM Binaiya with Bayesian Network Method. In International Journal of Marine Engineering Innovation and Research (Vol. 8, Issue 3).
Gazali, G. S., & Baroroh, I. (2022). Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction). BERKALA SAINSTEK, 10(4), 235. https://doi.org/10.19184/bst.v10i4.32674
Gray, C. F., Larson, E. W., & Prabantini, D. (2007). Project management: the managerial process Indeks (3rd ed.). Andi.
Kerzner, Harold., & Saladis, F. P. (2009). Project management workbook and PMP/CAPM exam study
Munir, M., Jajja, M. S. S., Chatha, K. A., & Farooq, S. (2020). Supply chain risk management and operational performance: The enabling role of supply chain integration. International Journal of Production Economics, 227. https://doi.org/10.1016/j.ijpe.2020. 107667
Omdahl, T. P. (1988). Reliability, Availability, and Maintainability (RAM) Dictionary (T. P. Omdahl, Ed.). ASQC Quality Press.
Padaga, L. K., Teknik, D., Fakultas, K., & Kelautan, T. (2018). PENJADWALAN BERDASARKAN ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK REPARASI KAPAL: STUDI KASUS MV. BLOSSOM.
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide).
DOI: http://dx.doi.org/10.12962/j25481479.v8i4.19328
Refbacks
- There are currently no refbacks.
| |||
|
|
|
|
P-ISSN: 2541-5972
E-ISSN: 2548-1479
IJMEIR journal published by Department of Marine Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember Surabaya Indonesia under licenced Creative Commons Attribution-ShareAlike 4.0 International Licence. Based on https://iptek.its.ac.id/index.php/ijmeir/