Hospital Auxiliary Vessel Fore Part Zone Planning to Improve Productivity with Precedence Diagram Method

Wenny Prawati, Intan Baroroh

Abstract


The rapid development of Construction Management in Indonesia demands an efficient scheduling system to overcome project complexity. This study focuses on the process of building a hospital ship at one of the large shipyards in East Java, especially in the Fore Part Zone which has a high level of complexity and a limited number of blocks. Delays in this project are caused by several technical constraints such as machine breakdowns and drawing delays. This research aims to improve productivity by using the Precedence Diagram Method (PDM), which enables more optimal work scheduling by overcoming overlapping activities. Three scheduling scenarios were compared: Existing, Plan A, and Plan B. Plan A involved crashing techniques with the addition of overtime hours to accelerate critical Assembly activities (A13 and A14), resulting in a project duration of 301 days and productivity of 74.80 JO/day. Plan B integrated the drawing availability milestone as a prerequisite for the start of fabrication, and applied the same crashing as Plan A. As a result, Plan B was able to complete the project in 284 days with the same productivity, but with a more realistic and adaptive scheduling approach to field conditions. Based on critical path analysis and time efficiency, Plan B is the most optimal schedule for the construction of Fore Part Zone. This research is expected to be a reference in planning and controlling complex ship construction projects.

Keywords


Construction Management; PDM; Productivity; Fore Part Zone; Hospital Ship.

Full Text:

PDF

References


Muthiatur Rohmah, "What is Critical Path Method? Definition, Methods & Types," dibimbing.id. Accessed: Jan. 14, 2025. [Online]. Available: https://dibimbing.id/blog/detail/apa-itu-critical-path-method-pengertian-metode-jenisnya

W. Amani, "Comparison of CPM, PDM, and Bar Chart-S Curve Technique Applications in Project Scheduling Optimization," 2012.

Haris Pradipta, "Making S-Curve (Project Management)," Malang, HARISPRADIPTA.blogspot.com. Accessed: Jan. 15, 2025. [Online]. Available: https://harispradipta.blogspot.com/2010/05/membuat-kurva-s-manajemen-proyek.html

Virginia, Ariestides, Dundu, and Jermias, "Analysis of Project Scheduling Using the PDM method using the concept of time reserves," Aug. 2022.

A. Andiyan, A. Syamil, B. Nusantara, and J. M. Samosir, "Project Management: Theory & Application," 2023. [Online]. Available: https://www.researchgate.net/publication/371175194

S. Samant and D. N. Raut, "Schedule and Cost Management using Earned Value Management," 2022. [Online]. Available: www.ijrpr.com

Michelle Andriana, "Getting to know Precedence Diagramming Method (PDM)," BinusUniversitySchoolofInformationSystems. Accessed: Dec. 17, 2024. [Online]. Available: https://sis.binus.ac.id/2022/02/14/mengenal-precedence-diagramming-method-pdm/

N. Mutia Astari and A. Momon Subagyo, "PROJECT MANAGEMENT PLANNING WITH CPM (CRITICAL PATH METHOD) AND PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) METHODS."

S. Romadhona, F. Kurniawan, and J. Tistogondo, "Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya's City Outer East Ring Road Construction Project (Segment 1)," International Journal of Engineering, Science and Information Technology, vol. 1, no. 2, pp. 53-61, Mar. 2021, doi: 10.52088/ijesty.v1i2.56.

Acer.id, "Knowing What is Microsoft Project that Facilitates Project Business Management," acer.id. Accessed: Dec. 17, 2024. [Online]. Available: https://www.acerid.com/berita-bisnis/apa-itu-microsoft-project-fungsi-dan-kelebihannya

Madcoms - Madiun, Microsoft Project 2003. Madcoms-Madiun, 2005.

M. Adrian, A. Maulana, and M. Basuki, "Analysis of the Effect of Man Hour on the Productivity Level of Shipyards in Surabaya," vol. 2, no. 3, pp. 175-184, 2023, doi: 10.58192/ocean.v2i3.1184.

D. Pratama Putra, M. Basuki, J. Shipbuilding Engineering, and J. Arief Rachman Hakim, Study of Increasing Subcontractor Labor Productivity on New Ship Building Work at PT Adiluhung Sarana Segara Indonesia. 2017.

Noor Virliantarto, "Technology Readiness Study of PT PAL INDONESIA for the Construction of 100 TEUS Container Ships Massively with Modular Technology," 123dok.com, 2017.




DOI: http://dx.doi.org/10.12962%2Fj25481479.v10i2.22852

Refbacks

  • There are currently no refbacks.


Abstracted / Indexed by:
      
  

 

 

 

 

 

P-ISSN: 2541-5972   

E-ISSN: 2548-1479

 

Lisensi Creative Commons

IJMEIR journal published by  Department of Marine Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember Surabaya Indonesia under licenced Creative Commons Attribution-ShareAlike 4.0 International Licence. Based on https://iptek.its.ac.id/index.php/ijmeir/