Risk Analysis of Decommissioning Process: Case Studies of Lima-Compresor Platform
Arif Windiargo, Daniel Mohammad Rosyid, Murdjito Murdjito
Abstract
The process of petroleum exploration and exploitation is a crucial activity in the fulfillment of energy needs in the world. The process of petroleum exploration and exploitation is currently centred on shallow water regions in the continental shelf. In the process of petroleum exploration and exploitation in shallow waters, the structure of which is commonly used is the jacket structure. In Southeast Asia there are about 1300 platforms, of which 80% is over 20 years old. When the platform has reached its operational limit, according to the ministerial regulation of ESDM number 1 year 2011 The platform must be decommissioning in accordance with existing technical standards. In the process of demolition, there are certainly risks and hazards that can interfere with the process of decommissioning. It is necessary to do a risk analysis to map the risks that can occur while preparing the mitigation steps. In this study, risk analysis arel conducted by determining the activity that has a significant degree of hazard where it is concluded that activities that have a significant risk level are activities related to construction, lifting, maintenance, well service, and maintenance. From each activity that has a significant hazard level, there was a process of determining the cause of risk using the Fault Tree Analysis (FTA) method while determining the barrier that serves to prevent a risk occurring. The next is to determine the impact that can be inflicted from risk by using the Event Tree Analyis (ETA) method while determining the barrier that serves to prevent and reduce the impact that occurs when there is a peril. These two FTA and ETA diagrams are combined to create a Bowtie diagram to explain in detail the risk management performed at each stage of the decommisiioning process.
Keywords
Decommissioning, Fault Tree Analysis, Event Tree Analysis, Bowtie Analysis
References
Parente, V. (2005). Offshore decommissioning issues: Deductibility and transferability. Energy Policy 34 (2006) 1992-2001 Elsavier Inc.
Purnawarman, F. D., 2016. Fakta tentang Offshore Decommissioning Indonesia. 3rd IndoDecomm in Oil and Gas
Rafiqa, A. F, (2019). Identifikasi Bahaya dan Analisa Risiko dalam Pemilihan Metode Pembongkaran Anjungan Lepas Pantai: Studi Kasus Bukit Tua Platform. Surabaya: Tugas Akhir Departement Teknik Kelautan FTK ITS.
Guntara, R. (2018). Analisis Risiko Kecelakaan Kerja dengan Menggunakan Bowtie Analysis pada Proyek Moorin Chain Replacment pada Production Barge "SEAGOOD 101". Surabaya: Tugas Akhir Departemen Teknik Kelautan FTK ITS.
Wong, W., 2010. The Risk Management of Safety and Dependability. Boston. Woodhead Publishing Limited.
Dewi, Y. P. (2017). Pemilihan Metode Pemotongan Kaki Jacket pada Proses Pembongkaran (Decommissioning) : Studi Kasus Attaka H Platform di Selat Makassar. Surabaya: Tugas Akhir DepertemenTeknik Kelautan FTK ITS.`
Setiarini, K. P, (2017). Analisa Tegangan Ultimate Pada Struktur Platform Terpancang Akibat Beban Runtuh (Studi Kasus L-Com Well Platform. Surabaya: Tugas Akhir Departemen Teknik Kelautan FTK ITS.
DOI:
http://dx.doi.org/10.12962/j2580-0914.v4i1.8705
Refbacks
- There are currently no refbacks.
Contact:
Pusat Publikasi Ilmiah LPPM Instutut Teknologi Sepuluh Nopember
Department of Ocean Engineering
Institut Teknologi Sepuluh Nopember (ITS)
Kampus ITS - Sukolilo
Surabaya 60111 - Indonesia
Phone/Fax: +62-31-592 8105
e-mail: ijoce@its.ac.id
ijoce.oe.its@gmail.com
International Journal of Offshore and Coastal Engineering by Department of Ocean Engineering is licensed under a Creative Commons Attribution 4.0 International.
Based on a work at https://iptek.its.ac.id/index.php/ijoce/index.
bni4d
klikjp
https://klik4dx.id/
klik4d login
mawar4d
rajajp188
raffi88
raffi888
klik4d
mpo1212
slot scatter hitam
22crown
22crown
slot gacor
22crown
22crown
22crown