Analysis of Pipe Lay Barge Hafar Neptune Capability in Pipelaying Operation at Offshore North West Java Oil and Gas Field

Ignasius Krisna Armanda, Eko Budi Djatmiko, Imam Rochani

Abstract


When pipelaying activity is carried out, the most influential factor is the significant wave height. In this final project, the maximum significant wave height allowed for the PLB during the pipelaying process was analyzed with the variation of pipe diameters, which are 8 inches, 10 inches, and 12 inches; variations in the direction of coming waves namely 0o, 45o, 90o, 135o, and 180o; and stinger angle variations. First, static analysis was performed using OFFPIPE software Then, Pipe Lay Barge (PLB) Hafar Neptune modelled with MOSES software and validated with ABS MODU codes. The output was RAO from the Hafar Neptune PLB. Next, dynamic analysis was performed with OFFPIPE software, where the input is static analysis, RAO of Pipe Lay Barge Hafar Neptune, and JONSWAP wave spectrum formulation. The result of the analysis was the significant wave height that could hit the PLB when pipelaying is 3 meters for all pipe diameter variations. For variations in the direction of the wave data, the maximum Hs were 3 meters for 0 ° and 180 °, 2.5 meters for 45 °, 1.5 meters for 90 ° and 135 °.

Keywords


Underwater pipeline installation, S-Lay, Pipe Lay Barge.

Full Text:

PDF

References


Guo, B., S. Song, J. Chako, A. Ghalambor.: Offshore Pipeline. Elsevier, UK, 2005.

Gong et al.: Numerical Modelling on Dynamic Behaviour of Deepwater S-Lay Pipeline. Ocean Engineering 88, 393-408, 2014.

Soegiono: Subsea Pipeline, Airlangga University Press, Surabaya, 2007. (in Bahasa Indonesia)

Bhavikatti et al: Minimization of Maximum Moment in Offshore Pipeline During Installation. Applied Ocean Research, Vol. 8, No.3, 1986.

Jasper et al: Analytical Verification of Requirements for Safe and Timely Lay-down of an Offshore Slay Pipeline Abandonment Head during Some Pipe-Lay Stops: A case study of Forcados Yokri Integrated Pipeline Project in Nigerian Shallow Offshore. West Africa Journal of Industrial & Academic Research Vol. 16 No. 1, 2016.

DNV: Marine Operation, General. DNV OS H-101. Det Norske Veritas, Norway. 2011.

Guande et al: Impact of Ocean Current and Seabed Fiction on The Picking-Up and Laying-Down Processes of Oil and Gas Pipelines. PETROL. EXPLORE. DEVELOP., 2013, 40(1): 119-125, 2013.

DNV: Rules for Submarine Pipeline System. DNV OS F-101. Det Norske Veritas, Norway. 1981.

ABS: Rules for Building and Classing Mobile Offshore Drilling Units. American Bureau of Shipping, ABS Plaza, Houston, TX, USA. 2004.

Clauss et al: Offshore Pipelaying Operation – Interaction of Vessel Motion and Pipeline Dynamic Stresses. Applied Ocean Research, 14: 175-190, 1992.

Chakrabarti: Hydrodynamics of Offshore Structures. CBI Industries, Illinois, U.S.A. 1987.

Djatmiko, E.B.: Behavior and Operability of Sea Buildings Above Random Waves. Surabaya: ITS Press. ITS Surabaya. Indonesia. 2012. (in Bahasa Indonesia)

Gong, S., Xu, P.: The Influence of Sea State on Dynamic Behaviour of Offshore Pipelines for Deepwater S-Lay. Ocean Engineering Vol. 111 No. 398-413, 2016.

DNV. Environmental Condition and Environmental Loads. DNV RP C-205. Det Norske Veritas, Norway. 2014.

DNVGL. On Bottom Stability Design of Submarine Pipeline. DNVGL RP F-109. Det Norske Veritas – Germanischer Lloyd, Norway. 2017.




DOI: http://dx.doi.org/10.12962/j2580-0914.v4i2.9338

Refbacks

  • There are currently no refbacks.


Contact:

IJOCE Editor
Department of Ocean Engineering
Institut Teknologi Sepuluh Nopember (ITS)
Kampus ITS - Sukolilo
Surabaya 60111 - Indonesia
Phone/Fax: +62-31-592 8105
e-mail: ijoce@its.ac.id
           ijoce.oe.its@gmail.com

 


International Journal of Offshore and Coastal Engineering by Department of Ocean Engineering is licensed under a Creative Commons Attribution 4.0 International.

  Lisensi Creative Commons

Based on a work at https://iptek.its.ac.id/index.php/ijoce/index.