Analisis Perbandingan Waktu Dan Biaya Bekisting Metode Konvensional Dengan Sistem Table Formwork Pada Pembangunan Gedung At-Taawun Universitas Muhammadiyah Surabaya
Abstract
Keywords
Full Text:
PDFReferences
J. Pollack, J. Helm, and D. Adler, ‘What is the Iron Triangle, and how has it changed?’, 2018. [Online]. Available: https://ssrn.com/abstract=3232647
F. Abdullah et al., ‘PERENCANAAN BEKISTING KNOCK DOWN DENGAN KOMBINASI SISTEM TABLE FORM PROYEK RUMAH SUSUN CAKUNG BARAT’, 2022. [Online]. Available: http://jos-mrk.polinema.ac.id/
W. Li, X. Lin, D. W. Bao, and Y. Min Xie, ‘A review of formwork systems for modern concrete construction’, Apr. 01, 2022, Elsevier Ltd. doi: 10.1016/j.istruc.2022.01.089.
M. Strickland, ‘TigerPrints Roman Building Materials, Construction Methods, and Architecture: The Identity of an Empire’, 2010. [Online]. Available: https://tigerprints.clemson.edu/all_theses
M. S. Gaddam and A. Achuthan, ‘A comparative study on newly emerging type of formwork systems with conventional type of formwork systems’, in Materials Today: Proceedings, Elsevier Ltd, Jan. 2020, pp. 736–740. doi: 10.1016/j.matpr.2020.06.090.
Awad S. Hanna, ‘CONCRETE FORMWORK SYSTEM’.
Anjas and Komarul, ‘COMPARISON OF SYSTEM METHODS (TABLE FORM) WITH SEMI SYSTEMS FROM COST ASPECTS IN THE APARTMENT MEIKARTA PROJECT’.
A. Husen, Manajemen Proyek, 2nd ed., vol. 2. Yogyakarta: Penerbit Andi, 2009.
S. Sastraatmadja, Analisa (cara modern) Anggaran Biaya Pelaksanaan. Bandung: Penerbit Nova, 1984.
Y. A. Messah, L. H. P. Lona, and D. A. T. Sina, ‘PENGENDALIAN WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI SEBAGAI DAMPAK DARI PERUBAHAN DESAIN’, 2013.
C. Besner and B. Hobbs, ‘THE PERCEIVED VALUE AND POTENTIAL CONTRIBUTION OF PROJECT MANAGEMENT PRACTICES TO PROJECT SUCCESS’, 2006.
A. Husen, Manajemen Proyek Konstruksi 2011. Yogyakarta: Penerbit Andi, 2011.
Y. Saraswati and R. Indryani, ‘Analisa Perbandingan Penggunaan Bekisting Semi Konvensional Dengan Bekisting Sistem Table Form Pada Konstruksi Gedung Bertingkat’, JURNAL TEKNIK ITS, vol. 1, no. September, pp. 67–71, 2012.
A. Raby, I. Widiasanti, and A. Neolaka, ‘PERBANDINGAN WAKTU PELAKSANAAN ANTARA BEKISTING SISTEM (TABLE FORMWORK) DENGAN BEKISTING SETENGAH SISTEM (SCAFFOLDING)PADA PELAT STRUKTUR GEDUNG’, Jurnal Menara Jurusan Teknik Sipil FT.UNJ, vol. 4, no. Juli, 2009.
DOI: http://dx.doi.org/10.12962%2Fj2579-891X.v23i4.21247
Refbacks
- There are currently no refbacks.

Jurnal Aplikasi Teknik Sipil by Pusat Publikasi Ilmiah LPPM Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
Based on work at https://iptek.its.ac.id/index.php/jats