Analisis Keterlambatan pada Proyek PT Jatim Taman Steel di Gresik dengan Menggunakan Lean Six Sigma Framework
Abstract
Keywords
Full Text:
PDFReferences
M. Sambasivan and Y. W. Soon, “Causes and effects of delays in Malaysian construction industry,” Int. J. Proj. Manag., vol. 25, no. 5, pp. 517–526, Jul. 2007.
L. Ernst & Young, “2013 Transfer pricing global reference guide,” 2013 Transf. pricing Glob. Ref. Guid., no. February, 2013.
Y. unit. Messah, T. Widodo, and M. Adoe, “Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Gedung di Kota Kupang,” J. Tek. Sipil, vol. II, no. 2, pp. 157–168, 2013.
M. Abduh, Pengenalan Konstruksi Ramping”, Kerjasama ITB dan Direktorat Jenderal Bina Konstruksi. Kementrian PUPR, 2016.
N. Garnett, D. T. Jones, and S. Murray, “Strategic Application of Lean Thinking,” Proc. 8th Ann. Conf. Int’l. Gr. Lean Constr., no. October 2011, 1998.
J. Iwan, “Studi Implementasi Sistem Last Planner Pada Proyek ‘x’ di Surabaya,” Petra Christian University, 2009.
O. Seppänen, G. Ballard, and S. Pesonen, The Combination of Last Planner System and Location-Based Management System, vol. 6. 2010.
M. Abduh and H. A. Roza, “Indonesian Contractors’ Readiness Towards Lean Construction,” Underst. Manag. Constr. Process Theory Pract. - 14th Annu. Conf. Int. Gr. Lean Constr. IGLC-14, pp. 543–549, 2006.
D. T. Saputra, “Lean Implementation to Improve Indonesian Construction: Incorporating Lean Principles to Improve Indonesian Construction by Minimising Rework Problems,” Northumbria university, 2013.
N. Randy, “Pengukuran Kualitas Berdasarkan Konsep Six Sigma Dalam Proyek Konstruksi (Studi Kasus pada PT. Kuda-Kuda Total Prima),” UAJY, Yogyakarta, 2005.
DOI: http://dx.doi.org/10.12962/j2579-891X.v16i1.2866
Refbacks
- There are currently no refbacks.
Jurnal Aplikasi Teknik Sipil by Pusat Publikasi Ilmiah LPPM Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
Based on work at https://iptek.its.ac.id/index.php/jats