Faktor Penghambat Implementasi Proyek Transportasi Masal berbasis Rel di Surabaya dengan Skema Kerjasama Pemerintah dengan Badan Usaha

Erfandi Zen Variamen, Mohammad Arif Rohman

Abstract


Public Private Partnership (PPPs) is one of the financing solutions in fulfilling infrastructure development for better public services. The rapid rate of population growth in the city of Surabaya is a challenge in developing transportation infrastructure. The alternative strategy is to revive rail-based mass transportation or called Tram. The purpose of this study is to determine the barriers in the implementation of the PPP scheme fo the Tram project. The research variables were obtained from literature review and were divided into 6 groups, namely Social, Legal, Economic, Environmental, Political, and Technology (SLEEPT). The research data was acquired based on four experts’ opinion in this area. Relative Important Index (RII), Confidence Interval (CI), and Pareto Diagram were employed to analyse the data. According to Pareto Diagram (81%), it was found that the economic variable had the two highest indicators, namely "High PPP procurement costs" with an RII value of 0.83 and "Weak access to PPP financing" with value of 0.77. Meanwhile, the legal variable has one indicator with the lowest value, namely the "Lack of Flexibility in Implementation" indicator with an RII value of 0.57. -----------------------------------------------------------Kerjasama Pemerintah Badan Usaha (KPBU) merupakan salah satu solusi pembiayaan dalam pemenuhan infrastruktur untuk pelayanan publik yang lebih baik. Pesatnya laju pertumbuhan penduduk di kota-kota besar seperti Surabaya menjadi tantangan dalam mengembangkan infrastruktur transportasi, berbagai alternatif strategi pun bermunculan, salah satunya menghidupkan kembali transportasi massal berbasis rel. yaitu Tram. Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor penghambat dalam pelaksanaan skema KPBU dalam pengadaan Tram. Variabel-variabel yang terdapat dalam penelitian ini diperoleh dari studi literatur. Teknik pengumpulan data yang digunakan adalah purposive sampling. Dalam penelitian ini dilakukan survei pendahuluan bersama expert kemudian dilakukan survei kuesioner utama. Selanjutnya dilakukan analisis dengan menggunakan Relative Important Index (RII), Confidence Interval (CI), dan Diagram Pareto. Dari hasil tersebut ditemukan 13 variabel yang dianggap sebagai faktor penghambat

Keywords


Private Partnership, Tram, Relative Important Index, Confidence Interval, Pareto Diagrams

Full Text:

PDF

References


J.-F. Yuan, S. Mirosław J, Q. Li and J. Shan, "The Driving Factors Of China’s Public-Private Partnership Projects In Metropolitian Transportation Systems: Public Sector’s Viewpoint," Journal of Civil Engineering and Management, vol. 16, no. 1, pp. 5-18, 2010.

Babatunde, S. Perera, L. Zhou and C. Udeaja, "Barriers to public private partnership projects in developing countries: A case of Nigeria," Engineering, Construction and Architectural Mana-gement, vol. 22, no. 6, pp. 669 - 691, 2015.

M. A. Rohman and I. P. A. Wiguna, "Evaluation of road design performance in delivering community project social benefits in Indonesian PPP,"

Erfandi Zen Variamen dkk, Jurnal Aplikasi Teknik Sipil, Volume 19, Nomor 4, November 2021 (469-478)

International Journal of Construction Management, 2019.

N. A. Khiyon and S. F. Mohamed, "Barriers and Drivers of Whole Life Cycle Costing of Sustainable Facility Management for PPP/PFI Projects in Malaysia," Chemical Engineering Transactions, vol. 63, pp. 721-726, 2018.

B. Li, A. Akintoye, P. J. Edwards and C. Hardcastle, "Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire survey," Engineering, Construction and Architectural Management, vol. 12, no. 2, pp. 125 - 148, 2005.

C. Chen and H. Doloi, "BOT application in China: Driving and impeding factors," International Journal of Project Management, vol. 26, pp. 388-398, 2008.

G. Currie and A. Shalaby, "Success and Chalenges in Modernizing Streetcar System Experience in Melborne, Australia and Toronto, Canada," Journal of the Transportation Research Board, pp. 31-39, 2007.

F. Kristiawan and M. A. Rohman, "Penilaian Kriteria Sukses Proyek Kerjasama Pemerintah dengan Badan Usaha (KPBU) pada Proyek Jalan Tol di Indonesia," Repository ITS, Surabaya, 2021.

Pujiarman, T. J. W. Adi and I. Warmadewanthi, "Faktor-faktor Keberhasilan Pengelolaan Insfrastruk-tur Air Limbah berbasis Masyarakat Kabupaten Soppeng," Repository ITS, Surabaya, 2016.

M. Gündüz, Y. Nielsen and M. Özdemir, "Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey," Journal of Management in Engineering, vol. 29, no. 2, pp. 133-139, 2013.

W. Hernandez, A. Mendez, R. Zalakeviciute and A. M. D. Marquez, "Robust Confidence Intervals for PM2.5 Concentration Measurements in the Ecuadorian Park La Carolina," Sensors, vol. 20, p. 645, 2020.

M. K. Al-Hanawi, "Barriers to the implementation of public-private partnerships in the healthcare sector in the Kingdom of Saudi Arabia," PLOS ONE, vol. 15, no. 6, 2020.

K. Weththasinghe, G. Brewer and T. Gajendran, "Barriers in Proper Implementation of Public Private Partnership (PPP) in Sri Lanka," in 40th AUBEA 2016 Radical Innovation in the Built Environment, Sri Lanka, 2016.

R. Janssen, R. d. Graaf, M. Smit and H. Voordijk, "Why local governments rarely use PPPs in their road development projects: Understanding the barriers," International Journal of Managing Projects in Business, vol. 9, no. 1, pp. 33 - 52, 2016.

D. Kamugumnya, "Health system’s barriers hindering implementation of public-private partnership at the district level: a case study of partnership for improved reproductive and child health services provision in Tanzania," BMC Health Services Research, p. 16:596, 2016.

A. Mahalingam, "PPP Experiences in Indian Cities Barriers, Enablers, and the way forward," Journal of Construction Engineering and Management, pp. 136 : 419-429 , 2010.

S. O. Babatunde and S. Perera, "Barriers to bond financing for public-private partnership infrastructure projects in emerging markets: a case of Nigeria," Journal of Financial Management of Property and Construction, vol. 22, no. 1, 2017.

L. Gunnigan and D. Eaton, "Barriers to Innovation in Public-Private Partnership (PPP)," in Proceedings of COBRA - The construction and building research conference of the Royal Institution of Chartered Surveyors, Technological University of Dublin, 2008.

H. Oktianatasari, "Audit Tata Kelola Teknologi Informasi pada PT Pelabuhan Indonesia III (Persero) dengan kerangka kerja Cobit 5," Institut Teknologi Sepuluh Nopember, Surabaya, 2017.




DOI: http://dx.doi.org/10.12962/j2579-891X.v19i4.9905

Refbacks

  • There are currently no refbacks.


Jumlah Kunjungan:Web
Analytics

Creative Commons License
Jurnal Aplikasi Teknik Sipil by Pusat Publikasi Ilmiah LPPM Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License

Based on work at https://iptek.its.ac.id/index.php/jats