FEASIBILITY ANALYSIS OF KEDIRI - TULUNGAGUNG TOLL USING JICA METHOD

Edna Rochmad Hermansyam, Wahju Herijanto

Abstract


The Kediri-Tulungagung Toll Road is an essential part of the Non-Trans Java Toll Road, which is a national strategic project aimed at facilitating economic activities in the southern part of East Java and improving connectivity to Kediri Airport. This study focuses on analyzing the economic and financial feasibility of the Kediri-Tulungagung toll road development project.The feasibility study involves assessing the project's viability, determining whether it should proceed or be delayed. The analysis includes evaluating traffic volume data, measuring road saturation levels before and after construction, and analyzing the transfer of road users to the toll road. Furthermore, an economic feasibility analysis is conducted to calculate savings in vehicle operating costs and travel time, as well as assessing metrics such as Benefit-Cost Ratio (BCR), Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PbP). Based on JICA 1 modeling and questionnaire responses, calibration values were determined for different vehicle classes. The economic feasibility analysis reveals a BCR value of 11,656 (BCR>1), an NPV of IDR 91,043,209,729,042 (NPV>0), and an IRR of 18.3811% (IRR>Interest rate). In the financial feasibility analysis using interest rates as discount rates, the BCR is 6,265 (BCR>1), the NPV is Rp 44,977,644,753,162 (NPV>0), the IRR is 11,872% (IRR>Interest rate), and the Payback Period occurs in the 24th year and 7th month after the toll road's operation. Based on these analyses, the Kediri-Tulungagung Toll Road is deemed economically and financially feasible when using interest rates as the discount rate.

Keywords


Kediri-Tulungagung toll road, viability, economic feasibility analysis, financial feasibility analysis, JICA 1

Full Text:

PDF

References


Sumaryoto, “Dampak keberadaan jalan tol terhadap kondisi fisik, sosial, dan ekonomi lingkungannya,” Journal of Rural and Development, vol. 1, no. 2, pp. 161-168, 2010.

“Peraturan Presiden Nomor 58 Tahun 2017 – KPPIP.” https://kppip.go.id/en/download/peraturan-presiden-nomor-58-tahun-2017-2/

B. P. J. T., Jalan tol Kediri – Tulungagung, Penerbit: PT. Gudang Garam TBK, 2022

S. Suandi and Chayati, N. “Studi kelayakan finansial pada proyek pembangunan pembangkit listrik tenaga minihidro (PLTM) Pongkor”. Seminar Nasional Sains Dan Teknologi, pp. 1–8, 2018.

Ofyar Z. T., Perencanaan & pemodelan transportasi. Bandung: Penerbit ITB, 2010.




DOI: http://dx.doi.org/10.12962/j20861206.v38i2.17342

Refbacks

  • There are currently no refbacks.



Journal of Civil Engineering is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

View My Stats