INVESTMENT RISK IDENTIFICATION FOR THREE STARS HOTEL IN BALI
Abstract
Keywords
Full Text:
PDFReferences
Ahmad, K.,(2004). Dasar-Dasar Manajemen Investasi dan Portofolio. Jakarta: PT. Rineka Cipta.
Bartels, J., (1987). Risk, Planning, and Execution. Journal of Cornell Hotel and Restaurant Administration Quarterly Vol. 28 No.3: p52-56.
Flanagan, R. and Norman, G., (1993). Risk Management and Construction.Cambridge: University Press.
Godfrey, P.S. and Halcrow, S. W., (1996). Control of Risk: A Guide to the Systematic Management of risk from construction. Westminster London, Construction Industry Research and Information Association (CIRIA).
Kerzner, H. (1995). Project Management. A ,System Approach to Planning, Scheduling, and Controling. Fifth edition. New York. Van Nostrand Reinhold.
Lesmana, I.G.N and Irawan, A., (2004). Analisa Nilai Probabilitas dan Dampak dari Resiko Investasi Real Estate Perumahan Kelas Menengah ke Atas. Bandung : Universitas Katolik parahyangan.
Vose, D., (1996). Risk Analysis. West Sussex: Jhon Willey & sons Ltd.
DOI: http://dx.doi.org/10.12962/j24609463.v7i1.2424
Refbacks
- There are currently no refbacks.
Jurnal Teknobisnis by LPPM ITS is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://iptek.its.ac.id/index.php/tekno/index.