Optimizing Small Excavator Maintenance Activity Planning Using the Reliability-Centered Maintenance (RCM) Method II

Imah Luluk Kusminah, Aulia Nadia Rachmat, Diah Ayu Nurjanah

Abstract


Construction activities include the stages of construction, operation, maintenance, demolition, and rebuilding of a building. One of the construction activities in Indonesia is the construction of double-track railways. In the double-track railway construction project, there is a small excavator A which often fails. The excavator is used for excavation, land stripping, and embankment work. Failures that occur can disrupt construction implementation and can result in the company experiencing losses. Maintenance activities in the construction company that is the research location have a maintenance schedule, namely every 3 months and every 6 months based on the manual book, without adjusting the condition of the equipment. Therefore, it is necessary to analyze excavator components so that appropriate maintenance is known. RCM II is a maintenance evaluation method so that system components run well and according to the expected function by determining a maintenance action that must be carried out based on the characteristics of machine use so that maintenance activities run optimally. This research uses the RCM II method to determine the maintenance schedule, as well as the FMEA method. The FMEA results show 43 failure modes. RCM II decision worksheet analysis showed that 8 components had scheduled discard task maintenance, 3 components had scheduled restoration task maintenance, and 1 component had scheduled on-condition task maintenance.


Keywords


Critical component, Excavator, Failures, FMEA, RCM II

Full Text:

PDF

References


A. M. Futri Fardila,Puji Wiranto, “Evaluasi Produktivitas Alat Berat pada Proyek Pembangunan Jalan Tol Ruas Bogor–Ciawi-Sukabumi,” J. Online Mhs. Bid. Tek. Sipil, vol. 1, no. 1, pp. 1–11, 2017.

D. P. Putra, “Desain Geometrik, Struktur, Beserta Metode Pelaksanaan Pembangunan Jalur Rel Ganda (Double Track) Trase Banyuwangi Baru – Kalibaru Kab. Banyuwangi,” Inst. Teknol. Sepuluh Nop. Surabaya, p. 259, 2017.

B. S. I. (BSI), “Committee member copy : Do not reproduce BSI Standards Publication Code of practice for strengthened / reinforced Committee member copy : Do not reproduce,” Bs 8006-2010, no. ISBN 978 0 580 53842 1, 2010.

R. B. Jones, V. M. Nilekani, and J. J. Stanley, “Enhanced reliability-centered maintenance,” Nuclear Plant Journal, vol. 9, no. 3. pp. 59–61, 91, 1991.

D. P. Sari, “Evaluasi Manajemen Perawatan dengan Metode Reliability Centered Maintenance (RCM) II pada Mesin Cane Cutter 1 dan 2 di Stasiun Gilingan PG Meritjan - Kediri,” Rekayasa, vol. 10, no. 2, p. 99, 2017.

M. dan N. F. Zulna, “Analisis Interval Pemeliharaan Komponen Kritis Unit Fuel Conveyor Dengan Pendekatan Reliability Centered Maintenance (Rcm,” J. Teknol. Ind. Pertan., vol. 32, no. 1, pp. 12–20, 2022, doi: 10.24961/j.tek.ind.pert.2022.32.1.12.

M. A. Ramadhan, T. Rahmiati, and S. Permana, “Studi Kerusakan Charging System Pada Unit Excavator Hyundai HX210S,” Pros. Semin. Nas. Tek. Mesin Politek. Negeri Jakarta, pp. 762–765, 2022, [Online]. Available: http://prosiding.pnj.ac.id

A. Suhandi and Nazaruddin, “Modifikasi Serta Pengujian Sistem Control dan Sistem Swing Model Excavator,” Jom FTEKNIK Univ. Riau, vol. 2, no. 1, pp. 1–14, 2015.

H. Basri, E. Diniardi, and A. I. Ramadhan, “Studi Analitik Desain Dimensi Silinder Boom Pada Hydraulic Excavator Pc 1250-7,” Pros. Semnastek, no. 3, pp. 1–7, 2015.

M. Zuchry, “Analisa gaya angkat dengan variasi sudut elevasi pada silinder pengangkat excavator cat 320,” J. Smartek, vol. 9, no. 4, pp. 300–310, 2011.

N. M. Sari, “Metode Pelaksanaan Pembangunan Proyek Apartemen One East Surabaya Dengan Metode Top-Down,” 2015. [Online]. Available: https://api.semanticscholar.org/CorpusID:208839129

N. Yogisworo and M. Dzulfikar, “Analisis Keausan Track Roller dan Carrier Roller Excavator Komatsu PC 200 – 8,” Semin. Nas. SAINS dan Teknol., pp. 13–19, 2021.

D. S. Dhamayanti, J. Alhilman, and N. Athari, “Usulan Preventive Maintenance Pada Mesin Komori Ls440 Dengan Menggunakan Metode Reliability Centered Maintenance (Rcm Ii) Dan Risk Based Maintenance (Rbm) Di Pt Abc,” J. Rekayasa Sist. Ind., vol. 3, no. 02, p. 31, 2016, doi: 10.25124/jrsi.v3i02.29.

D. Aldri and A. E. Nurhidayat, “Usulan Strategi Perawatan Excavator Menggunakan Metode RCM, Age Replacement dan RCS,” J. Optimasi Tek. Ind., vol. 3, no. 2, p. 56, 2021, doi: 10.30998/joti.v3i2.10297.

R. Tri Sulistiyono, A. Iviana Juniani, D. Iva Setyana, T. Keselamatan dan Kesehatan Kerja, and P. Perkapalan Negeri Surabaya, “Implementation of RCM II (Reliability Centered Maintenance) and RPN (Risk Priority Number) in Risk Assessment and Scheduling Maintenance Task at HPB (High Pressure Boiler) Base On JSA (Job Safety Analysis),” Performa, vol. 7, no. 2, pp. 46–59, 2008.




DOI: http://dx.doi.org/10.12962/j25481479.v9i1.19844

Refbacks

  • There are currently no refbacks.


Abstracted / Indexed by:
      
  

 

 

 

 

 

P-ISSN: 2541-5972   

E-ISSN: 2548-1479

 

Lisensi Creative Commons

IJMEIR journal published by  Department of Marine Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember Surabaya Indonesia under licenced Creative Commons Attribution-ShareAlike 4.0 International Licence. Based on https://iptek.its.ac.id/index.php/ijmeir/