Scheduling Program Analysis of Pressure Relief Device (PRD) According to RBI API 581 on Production Gas Separator System
Abstract
Keywords
Full Text:
PDFReferences
M. Hendra, Analisis Penerapan Metode RBI dalam Pemeriksaan Keselamatan Kerja pada Industri MIGAS, Salambe: UI, 2010.
M. Malek, Pressure Relief Device, USA: McGraw-hill Company,inc, 2006.
A. R. 581, Risk Based Inspection Technology, 3rd edition, Washington,D.C: API Publishing Service, 2016.
D. Arina, Analisis Remaining Life dan Penjadwalan Program Inspeksi pada Pressure Vessel dengan Menggunakan Metode Risk Based Inspection, Surabaya: ITS, 2016.
M. Hellemans, The Safety Valve Handbook, USA: ELSEVIER, 2009.
A. R. 580, Risk-Based Inspection Technology, 3rd edition, Washington,D.C: API Publishing Service, 2016.
H. Devold, Oil and Gas Production Handbook An Introduction to Oil and Gas Production, Transport, Refining and Petrochemical Industry, USA: Etterstad, 2013.
A. R. 576, Inspection of Pressure Relief Device 3rd edition, Washington,D.C: API Publishing Service, 2009.
DOI: http://dx.doi.org/10.12962/j25481479.v3i1.4105
Refbacks
- There are currently no refbacks.
| |||
|
|
|
|
P-ISSN: 2541-5972
E-ISSN: 2548-1479
IJMEIR journal published by Department of Marine Engineering, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember Surabaya Indonesia under licenced Creative Commons Attribution-ShareAlike 4.0 International Licence. Based on https://iptek.its.ac.id/index.php/ijmeir/