Penentuan Waktu Optimum Preventive Maintenance pada Mesin Pellet Mill di PT Japfa Comfeed Indonesia, Tbk. Unit Margomulyo menggunakan Metode Geometric Process
Abstract
Keywords
Full Text:
PDFReferences
D. W. Ariani, Pengendalian Kualitas Statistik Pendekatan Kuantitatif dalam Manajemen Kualitas, Yogyakarta: Andi, 2004.
S. Rigdon and A. Basu, Statistical Methods for the Reliability of Repairable System, New York: John Wiley & Sons, 2000.
Y. Lam, "Nonparametric Inference for Geometric Processes," Communications in Statistics - Teory and Methods, pp. 2083-2105, 1992.
F. K. Leung and C. Fong, "A Repair-Replacement Study for Gearboxes Using Geometric Processes," International Journal of Quality & Reliability Management, vol. 17, no. 3, pp. 285-304, 2000.
P. Permatasari, "Optimasi Waktu Penggantian Komponen Air Cycle Machine (ACM) Pesawat Terbang CRJ-1000 Menggunakan Metode Geometric Process," Jurnal Sains dan Seni ITS, vol. 5, 2016.
Y. Lam, "A Note on the optimal replacement problem," Advances in Applied Probability, pp. 479-482, 1988.
T. C. Adams, "John F Kenedy Space Center," [Online]. Available: https://kscddms.ksc.nasa.gov/Reliability/Document/Laplace_Test.pdf. [Accessed 6 Juni 2017].
G. J. Wang and Y. L. Zhang, "Geometric Process model for a system with inspections adn preventive repair," Computers & Industrial Engineering, pp. 13-19, 2014.
DOI: http://dx.doi.org/10.12962/j27213862.v1i2.6725
Refbacks
- There are currently no refbacks.
Inferensi by Department of Statistics ITS is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://iptek.its.ac.id/index.php/inferensi.
ISSN: 0216-308X
e-ISSN: 2721-3862
View My Stats