Pengendalian Penyelesaian Proyek Berbasis Kinerja Menggunakan Hybrid Earned Value - Crash Program

Jojok Widodo Soetjipto, Della Ayu Adinanda, Syamsul Arifin

Abstract


Project performance is an essential reference in supporting the success of construction implementation so that costs and completion time are according to plan. Previous research states that projects that experience delays will impact cost overruns which can be detrimental to contractors and project owners. This study takes the case of a performance evaluation on a building construction project that experienced a delay of 15.496% (25th week). The performance measurement results using the earned value, the project has an SPI value = 0.493, meaning that the project experienced significant delays. If the project is not controlled, it will take 72 weeks to complete from the 48-week plan at the cost of Rp. 64.57 billion from Rp. 57.23 billion. Control of this project needs acceleration which was carried out using the Crash Program method in 2 ways: (i) increasing the number of workers and (ii) maintaining the number of existing workers but increasing overtime hours. A practical solution alternative is to increase the number of workers, which results in a project completion time of 43 weeks with a final project cost of IDR 58.89 billion

Keywords


delay; earned value; crashing program; optimal time and cost

Full Text:

PDF

References


Soeharto, "Manajemen Proyek (Dari Konseptual Sampai Operasional)," Erlangga, Jakarta, 1999.

K. M. Bachtiar, “Analisis Rescheduling Pelaksanaan Proyek Gedung BRI KANWIL Malang Menggunakan Precedence Diagram Metthod (PDM) dan Program Evaluation and Review Technique (PERT),” Malang: Tugas Akhir, Jurusan Teknik Sipil Fakultas Teknik Universitas Jember, 2021.

M. Tolomau, “Metode Penjadwalan Proyek Konstruksi,” Jurnal Seminar Nasional Teknologi, 2018.

Y. Malifa, A. K. T. Dundu, dan G. Y. Malingkas, “Analisis Percepatan Waktu dan Biaya Proyek Konstruksi Menggunakan Metode Crashing,” J. Sipil Statik, vol. 7, no. 6, hal. 681–688, 2019.

F. Yuwiantoro, “Penjadwalan Proyek Pembangunan Gedung Akuntansi Fakultas Ekonomi Universitas Jember Menggunakan Metode Gantt Chart,” Tugas Akhir, 2018.

F. Fahirah, “Identifikasi Kelemahan Metode Earned Value Pada Pengukuran Kinerja Biaya dan Waktu Proyek Konstruksi,” Jurnal Teknik Sipil Infrastruktur, vol. Vol. 3 no. 2, pp. 65 - 70, 2013.

Fleming, Q.W. and Koppelman, J.M, The Essence and

Evolution of Earned Value. AACE Transactions

Y. Waldi, "Monitoring Pelaksanaan Pengendalian Progres Biaya dan Waktu dengan Metode Konsep Nilai Hasil (Earned Value) pada Proyek Tower Caspian Grand Sungkono Lagoon Surabaya," Tugas Akhir, p. 101, 2018.

Fernando, T. T. Arsjad, dan M. Sibi, "Analisis Percepatan Waktu Dan Biaya Proyek Konstruksi Menggunakan Metode Crashing Pada Pembangunan Kalyana Residence Paal 2 Manado," Jurnal Sipil Statik , vol. Vol.8 No.5 , pp. 741-748, 2020.

B. Susetyo, "Analisis Keterlambatan Sebagai Pendukung Keputusan Bagi Pengendalian Prestasi Pekerjaan Dengan Pendekatan "Koowledge-Based-Systems"," Solo: Tesis, Program Studi Teknik Sipil Fakultas Teknik Sipil Universitas Indonesia, p. 9, 1996.

I. d. L. Widiasanti, "Manajemen Konstruksi," PT. Remaja Rosdakarya, Bandung, 2013.

W. I. Ervianto, "Teori Aplikasi Manajemen Proyek Konstruksi," Bandung, Rosda, 2004.

Setyorini, A., Wiharjo A, K., “Optimasi Waktu dan Biaya Dengan Precedence Diagram Method Pada Proyek Solo Grand Mall”, Semarang: Skripsi, Jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro, 2005.

M. Priyo, dan A. Sumanto, "Analisis Percepatan Waktu dan Biaya Proyek Konstruksi dengan Penambahan Jam Kerja (Lembur) Menggunakan Metode Time Cost Trade Off (Studi Kasus: Proyek Pembangunan Prasarana Pengendali Banjir), Fakultas Teknik, Jurusan Teknik Sipil, Universitas Muhammadiyah Yogyakarta," Vols. Jurnal Ilmiah Semesta Teknika Vol.19 No. 11-15, 2016.

E. A. Budianto dan A. E. Husin, "Analisis Kinerja Biaya dan Waktu Terpadu dengan Konsep Nilai Hasil," Jurnal Aplikasi Teknik Sipil, Vol. 19, Nomor 3, pp. 305-310, 2021.




DOI: http://dx.doi.org/10.12962/j2579-891X.v22i2.15996

Refbacks

  • There are currently no refbacks.


Jumlah Kunjungan:Web
Analytics

Creative Commons License
Jurnal Aplikasi Teknik Sipil by Pusat Publikasi Ilmiah LPPM Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License

Based on work at https://iptek.its.ac.id/index.php/jats