Faktor-faktor yang Berkontribusi terhadap Kesuksesan Proyek Pengedokan Kapal
Abstract
Keywords
Full Text:
PDFReferences
Kementerian Perhubungan, Statistik Perhubungan Buku 1. 2020.
Kementerian Perhubungan, Peraturan Dirjen Perhubungan Laut Nomor HK.103/1/4/DJPL-17 Tahun 2017 tentang Prosedur Pengedokan (Perlimbungan) Kapal Berbendera Indonesia. Indonesia, 2017.
B. Ma’ruf, “Ship repair business analysis of the indonesian shipyards,” in The 4th PPM National Conference on Management Research, 2010, no. November 2010.
R. Atkinson, “Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria,” Int. J. Proj. Manag., vol. 17, no. 6, hal. 337–342, 1999, doi: 10.1016/S0263-7863(98)00069-6.
R. Nurwanti dan T. W. Pribadi, “Analisa Peningkatan Kualitas Layanan Jasa Reparasi Kapal Di Galangan Kapal Jawa Timur,” J. Tek. ITS, vol. 5, no. 1, hal. G41–G46, 2016, doi: 10.12962/j23373539.v5i1.15945.
D. B. Kusuma dan I. P. A. Wiguna, “Pengaruh faktor penyebab keterlambatan proyek terhadap penyelesaian reparasi kapal di PT . Dok dan Perkapalan Surabaya (Persero),” in Prosiding Seminar Nasional Manajemen Teknologi XVIII, 2013, hal. B-21-1-B-21-8.
A. Rahman dan H. Supomo, “Analisa Kepuasan Pelanggan pada Pekerjaan Reparasi Kapal dengan Metode Quality Function Deployment (QFD),” J. Tek. ITS, vol. 1, no. 1, hal. G297–G302, 2012.
A. B. Chandragiri, S. H. Jeelani, S. Akthar, dan N. Lingeshwaran, “study and identification of the time and cost overrun in the construction project,” Mater. Today Proc., vol. 47, hal. 5426–5431, 2021, doi: 10.1016/j.matpr.2021.06.268.
S. M. Zanjirchi dan M. Moradi, “Construction project success analysis from stakeholders’ theory perspective,” African J. Bus. Manag., vol. 6, no. 15, hal. 5218–5225, 2012, doi: 10.5897/ajbm11.2437.
R. Maqbool dan Y. Sudong, “Critical success factors for renewable energy projects; empirical evidence from Pakistan,” J. Clean. Prod., vol. 195, hal. 991–1002, 2018, doi: 10.1016/j.jclepro.2018.05.274.
Y. Li, H. Song, P. Sang, P. H. Chen, dan X. Liu, “Review of Critical Success Factors (CSFs) for green building projects,” Build. Environ., vol. 158, no. January, hal. 182–191, 2019, doi: 10.1016/j.buildenv.2019.05.020.
H. C. O. Unegbu, D. S. Yawas, dan B. Dan-asabe, “An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria,” J. King Saud Univ. - Eng. Sci., vol. 34, hal. 240–249, 2022, doi: 10.1016/j.jksues.2020.10.001.
I. Agsarini dan I. P. A. Wiguna, “Pengaruh faktor kondisi proyek terhadap kinerja proyek konstruksi,” Pros. Semin. Nas. Manaj. Teknol. XXII, no. 1991, hal. 1–8, 2015.
M. Basuki, P. I. Santosa, dan T. Alfiah, “Penilaian Risiko Lingkungan (Environmental Risk Assessment) pada Pekerjaan Reparasi Kapal di Perusahaan Galangan Kapal Subklaster Surabaya,” Pros. Semin. Nas. Apl. Sains Teknol., no. November, hal. 567–570, 2016.
L. K. Padaga, I. Rochani, dan Y. Mulyadi, “Penjadwalan Berdasarkan Analisis Faktor-Faktor Penyebab Keterlambatan Proyek Reparasi Kapal: Studi Kasus MV. Blossom,” J. Tek. ITS, vol. 7, no. 1, 2018, doi: 10.12962/j23373539.v7i1.29075.
DOI: http://dx.doi.org/10.12962%2Fj2579-891X.v23i3.18339
Refbacks
- There are currently no refbacks.
Jurnal Aplikasi Teknik Sipil by Pusat Publikasi Ilmiah LPPM Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
Based on work at https://iptek.its.ac.id/index.php/jats