Analysis of the impact of soil excavation stages on slope stability case study of road and bridge construction projects in bts. Singaraja-Mengwitani at point 7E, Bali
Abstract
The Singaraja - Pengayaman BTS Road Section is a national road located in the central corridor of Bali Island and includes several critical locations in terms of road geometry. Geometric adjustments are being addressed through the BTS Singaraja - Mengwitani Road and Bridge Construction Project Section 7E, involving excavation work up to 64 meters high at STA. 0+119.87. This study aims to analyze slope stability based on existing conditions, evaluate the impact of excavation method variations on slope stability, and determine effective excavation methods both with and without the influence of water on slope stability using Plaxis 2D program. The research results indicate that the safety factor (SF) value of the existing slope prior to excavation was 1.337, whereas it decreased to 1.034 after the final excavation stage. According to the SNI 8460:2017 standard (SF < 1.5), the slope condition in the final excavation stage is deemed unsafe. Excavations with depth variations of 1 meter, 2 meters, and 3 meters, as well as at slope angles of 45˚, 55˚, and 65˚, showed similar impacts on slope stability. A significant decrease in the safety factor occurred from the 7th excavation bench downward, where the safety factor fell below 1.3. At the end of the excavation process, the deepest sliding surface reached a depth of 20.11 meters. At an elevation of +36.5 meters, where the groundwater level reaches 56.40% of the total slope height, which marks the boundary between soil and rock layers, the safety factor drops to 1.040. Further increases in groundwater levels above +36.5 meters could render the slope unstable and potentially lead to collapse.
Full Text:
PDFReferences
Badan Standardisasi Nasional. (2018). Standar Nasional Indonesia SNI 8460:2017 Persyaratan Desain Geoteknik. Jakarta.
Balai Pelaksanaan Jalan Nasional Wilayah Jawa Barat-Bali, Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum, Indonesia. (2022). Detailed Engineering Design Pembangunan Jalan Dan Jembatan Bts Kota Singaraja - Titik 7D Dan 7E Mengwitani.
Hoek, Evert. (2006). Practical rock engineering. Evert Hoek Consulting Engineer Inc.
Balai Pelaksanaan Jalan Nasional Wilayah Jawa Barat-Bali, Direktorat Jenderal Bina Marga, Kementerian Pekerjaan Umum, Indonesia. (2022). Laporan Investigasi Tanah Untuk Pembangunan Ruas Jalan Baru Bts Kota Singaraja – Mengwitani (Titik 7DE, 9-10) Provinsi Bali.
Mochtar, I.B. (2015). Parameter empiris untuk tanah lunak di lapangan. Institut Teknologi Sepuluh Nopember. Surabaya.
Mochtar, Noor Endah. (2012). Modul pengajaran metode perbaikan tanah (RC09-1402). Jurusan Teknik Sipil FTSP ITS. Surabaya.
Wang ZY, Gu DM, Zhang WG. (2020). “Influence of excavation schemes on slope stability: A DEM study”. Journal of Mountain Science 17(6). https://doi.org/10.1007/s11629-019-5605-6.
Wu L, He K, Guo L, Sun L. (2022). “Analysis of stability law and optimization of slope angle during excavation of deep concave mine slope”. PLoS ONE 17(7): e0271700. https://doi.org/10.1371/journal.pone.0271700.
DOI: http://dx.doi.org/10.12962/jifam.v7i0.22441
Refbacks
- There are currently no refbacks.
Visitor :
Flag Counter
Journal Of Infrastructure & Facility Asset Management by Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.