The Risk Assessment of Genset Installation Project Using Fault Tree Analysis In Indonesia
Abstract
Keywords
Full Text:
PDFReferences
Indonesia Ministry of Energy and Mineral Resource (ESDM). 2016 “Statistik Ketenagalistrikan” Edition number 30 page 33
Marzouk, M. M. & Rasas, T. E. 2013. “Analysing Delay Causes In Egyptian Construction Projects”. Journal Of Advanced Research.
Ariyani, Dewi & Vanany, Iwan. 2014. “Risk assessment dengan simulasi monte carlo dan mitigasinya pada industri compressed natural gas”. Surabaya : Institut Teknologi Sepuluh Nopember Surabaya.
Hoyland.A, Rausand.M. 1994. "System Reliability Theory". John Wiley & Sons. Inc. New York.
Priyanta, Dwi. 2000. “Keandalan Dan Perawatan”. Surabaya: Institut Teknologi Surabaya.
Sweis, G., Sweis, R., Hammad, A. A. & Shboul, A. 2008. "Delays In Construction Projects: The Case Of Jordan". International Journal Of Project Management, 26.
IEC 61025 (2006), Fault tree analysis (FTA), 2th Edition, International Standard.
DOI: http://dx.doi.org/10.12962/j23546026.y2020i3.11070
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.