Adopting Risk Based Maintenance Strategy of Export Gas Pipeline Using House of Risk: A Proposed Framework

Moko Prijambodo, Imam Baihaqi

Abstract


42” SNP-BEM is the biggest buried gas export pipeline belong to PT XYZ and has been operated joinly with PT POMA for duration of 20 years. Until today, this pipe has survived very well from the worst potential failure or risk events such as rupture and leak since all strategic of maintenances are considered as sufficient facing the sources of risk agent, despite still different perceptions are presence among the operators in real application. Nevertheless, following the operation versus times, there is an increasing of potential external threat or risk agents due to the growth of housing, the overlapped operational permit of industrial of non-oil/gas, illegal road crossing which may cause the occurrence of risk events/failures. In 2016, there was a critical incident of the soil movement caused by the excessive load of coal’s stock pile nearby ROW and impacted to the pipe movement about 6 meters in horizontal and 2 meters in vertical and may lead to disastrous. Therefore, a more effective maintenance strategy is to be developed to reduce these risks. Combination of Fish Bone diagram (FBD) and House of Risk (HOR) is selected to identify the sources of risk and to develop more effective risk-based maintenance strategy. Based on the assessment, it is identified (twelve) 12 credible risk agents which contributing to pipeline failures/risk events and (eight) 8 proposed preventive actions to reduce the risk. These proposed actions shall be agreed by all operators as a reference for developing risk-based maintenance strategy.

Keywords


Pipeline; Maintenance; Risk Event; Risk Agent; Preventive Action

Full Text:

PDF

References


Pujawan, I. N., Geraldin, L. H., (2009), House of Risk: A Model for Proactive Supply Chain Risk Management, Business Process Management Journal, Vol. 15, No. 6, page. 953-967.

Utari, R., Baihaqi, I., (2015), Perancangan Strategi Mitigasi Resiko Supply Chain di PT Atlas Copco Nusantara dengan Metoda House of Risk, Prosiding Seminar Nasional Manajemen Teknologi XXII, Surabaya. Suhartono, “Penetuan Strategi perawatan pipa penyalur untuk mengurangi resiko menggunakan HOR” Institut Teknologi Sepuluh Nopember, 2016,

Dey, Prasantakumar., Ogunlan, Stephen., Naksuksakul, Sittichai. (2015), Risk Based Maintenance Model for Offshore Oil & Gas pipeline : A Case Study, Journal of Quality in Maintenance Engineering, Vol 10.No 3. 2004.pp 169-183

Achilaa, M. E., Muchiri, P. N. and. Ikua, B. W. (2015), Selecting an appropriate maintenance policy for petroleum pipeline system using AHP: A case study/Journal of Sustainable Research in Engineering, Vol. 2 (1) 2015, pg. 17-22

Bungaran, “Determining Repair Priority of flange dissmiliar material findings by using Fuzzy – AHP : A Case study PT MHK”, Institut Teknologi Sepuluh Nopember, 2018.

American Society Mechanical Engineer, ASME B31.8S, Managing system Integrity of Gas Pipeline, 2010.

Menteri Pertambangan dan Energi, Keputusan tentang keselamatan kerja pipa penyalur minyak dan gas bumi, Nomor 300.K/38/M.PE,1997.




DOI: http://dx.doi.org/10.12962/j23546026.y2020i6.11141

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.