Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling
Abstract
Full Text:
PDFReferences
. Badan Ekonomi Kreatif. (2015). Rencana Pengembangan Arsitektur Nasional 2015-2019. Badan Pusat Statistik. (2019). Konstruksi Dalam Angka 2019. 368.
. Ballard, G., & Howell, G. A. (2003). Competing Construction Management Paradigms. Contruction Research Congress, Winds of Change: Integration and Innovation in Construction, Proceedings of the Congress, 1(October), 321–328.
. Bappenas RI. (2019). Rencana Pembangunan Jangka Menengah Nasional 2015-2019. Rencana Pembangunan Jangka Menengah Nasional 2015-2019, 313. https://doi.org/10.1017/CBO9781107415324.004
. Bergland, E. (2016). Get it Done On Time! In Get it Done On Time! https://doi.org/10.1007/978-1-4842-1860-0 Bhan, A., & Waghmare, A. (2016). Application of Critical Chain Project Management To. 5(12), 781–785.
. Blaskovics, B. (2016). The impact of project manager on project success - The case of ICT sector. Society and Economy, 38(2), 261–281. https://doi.org/10.1556/204.2016.38.2.7
. Direktorat Jenderal KSDAE. (2020). Laporan Kinerja 2019 Direktorat Jenderal Konservasi Sumber Daya Alam dan Ekosistem Kementerian Lingkungan Hidup dan Kehutanan.
. Garel, G. (2013). A history of project management models: From pre-models to the standard models. International Journal of Project Management, 31(5), 663–669. https://doi.org/10.1016/j.ijproman.2012.12.011
. Göksu, A. (2017). Implementation Of Critical Path Method And Project Evaluation And Review Technique Implementation Of Critical Path Method And Project Evaluation And Review Technique Ali Göksu , Selma Ćatović International Burch University , Faculty of economics Managemen. 2017(September 2014).
. Ioannou, P. G., & Yang, I. T. (2016). Repetitive Scheduling Method: Requirements, Modeling, and Implementation. Journal of Construction Engineering and Management, 142(5), 1–13. https://doi.org/10.1061/(ASCE)CO.1943- 7862.0001107
. Kerzner, H. (2017). Project management a systems approach to planning, scheduling, and controlling.
. Leach, L. P. (2004). Critical Chain Project Management, Second Edition. In Management. http://www.amazon.com/dp/1580539033
. Li, X. B., Nie, M., Yang, G. H., & Wang, X. (2017). The Study of Multi-Project Resource Management Method Suitable for Research Institutes from Application Perspective. Procedia Engineering, 174, 155–160. https://doi.org/10.1016/j.proeng.2017.01.191
. Mian M, K. U. A., & Koskinen. (2008). Project Portfolio Control and Portfolio. Project Management Journal, 39(March 2008), 28–42. https://doi.org/10.1002/pmj
. Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: Linking Project Management Performance and Project Success. International Journal of Project Management, 32(2), 202–217. https://doi.org/10.1016/j.ijproman.2013.05.012
. Munaf, T., & Pesik, R. J. (2019). Ekonomi Kreatif outlook 2019. Badan Ekonomi Kreatif, 23–24.
. Ph, R. O., Arvianto, A., Ramanda N, R., Miller, D. P., Geekie, A., Steyn, H., Buchtik, L., Liu, S., Satzinger, J., Cruz, A. P. S., Proyect Management Institute, I., Gunduz, M., Naser, A. F., Li, Y., Solís, J., Hazzan, O., Pikas, E., & Sacks, R. (2013). A structured literature review: value stream mapping (VSM) in construction industry. Management, 53(2), 123. https://doi.org/10.1017/CBO9781107415324.004
. Popper, H., & Koffler, D. (1967). The goal. In Journal of the Mount Sinai Hospital, New York (Vol. 34, Issue 4). https://doi.org/10.4324/9781315851525-6
. Project Management Institute. (2017). A Guide to The Project Management Body of Knowledge PMBOK® Guide 6th Edition.
. Roswidiyastuti, W. (2009). UNIVERSITAS INDONESIA KRITERIA WORK BREAKDOWN STRUCTURE UNTUK
. PENGENDALIAN PROYEK YANG EFEKTIF ( Studi Kasus : Pekerjaan Lanjutan Perluasan dan Renovasi Gedung dan Pembangunan Gedung Parkir Roda 2 Tahap II Badan Pusat Statistik , Jakarta ) ( Studi Kasus : 1–368.
. Shi, Q. (2011). Rethinking the implementation of project management: A Value Adding Path Map approach. International Journal of Project Management, 29(3), 295–302. https://doi.org/10.1016/j.ijproman.2010.03.007
. Shurrab, M. (2015a). Traditional Critical Path Method versus Critical Chain Project Management: A Comparative View. International Journal of Economics & Management Sciences, 04(09), 6359. https://doi.org/10.4172/2162- 6359.1000292
. Shurrab, M. (2015b). Traditional Critical Path Method versus Critical Chain Project Management: A Comparative View. International Journal of Economics & Management Sciences, 04(09), 4–9. https://doi.org/10.4172/2162- 6359.1000292
. Taylor, M. D. (2009). How to Develop Work Breakdown Structures. p.1-10.
. Viriya, E., Pangestu, M. E., & Ahmett, I. (2016). Kebangkitan Ekonomi Kreatif. Retas, 1, 20.
. Voordt, V. Der, J.M., T., Wegen, V., & Herman, B. R. (2007). Architecture in use: An introduction to the programming, design and evaluation of buildings. Architecture in Use: An Introduction to the Programming, Design and Evaluation of Buildings, 1–238. https://doi.org/10.4324/9780080490472
. Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009). Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), 782–790. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:8(782).
DOI: http://dx.doi.org/10.12962/j23546026.y2020i3.11205
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.