A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant

Hery Setiyawan, Udisubakti Ciptomulyono

Abstract


A proper maintenance project selection is a key to support performance of power plant. The issue of maintenance is allocation a limited budget to achieve the goals of various maintenance criteria and conflicting objectives. This paper presents an integrated AHP and goal programming. In the first step, since maintenance is measured in qualitative criteria, it is recommended to use AHP to weight and quantify criteria. Second step utilize GP which uses the criteria weights and alternative priorities calculated with AHP to optimize multiple objectives without exceeding available resource constraint. The results show that the approach can aid in selection optimal projects within available budget.

Keywords


Analytic Hierarchy Process; Goal Programming; Performance; Project Selection

Full Text:

PDF

References


PT PLN (Persero), “Rencana Usaha Penyediaan Tenaga Listrik PT Perusahaan Listrik Negara (Persero) Tahun 2018 s.d 2027’, Kementrian Energi dan Sumber Daya Mineral, Jakarta, 2018.

PT PLN (Persero). ”Protap Deklarasi Kondisi Pembangkit dan Indeks Kinerja Pembangkit, PT PLN (Persero), Jakarta, 2017.

NERC, “Predicting Unit Availability Top-Down Analyses for Predicting Unit Availability, “ North American Electric Reliability Council, 1991.

NERC,” Predicting Generating Unit Reliability,” North American Electric Reliability Council, North American Electric Reliability Council, 1995.

Bertolini M., Bevilacqua M., “A combined goal programming - AHP approach to maintenance selection problem,” Reliability Engineering and System Safety, vol. 91, pp. 839–848, Oct. 2005.

Ciptomulyono U.,"Pengembangan Model Optimasi Keputusan Multi Kriteria MCDM (Multi Criteria Decision Making) untuk Evaluasi dan Pemilihan Proyek," Institut Teknologi Sepuluh Nopember, 2000.

Ho, W, “Combining Analytic Hierarchy Process and Goal Programming for Logistics Distribution Network Design, IEEE International Conference on Systems, Man and Cybernetics, pp. 714-719, 2007.

Rusli A, Ciptomulyono U,” Pemilihan Kontraktor Perbaikan Rotor di Pembangkit Listrik PT XYZ Dengan Menggunakan Metode Analytical Hierarchy Process dan Goal Programming,” Prosiding Seminar Nasional Manajemen Teknologi, XVIII, pp. 111-119, Jul 2013.

Badri M.A, “ A combined AHP - GP model for qualitycontrol systems,” Int. J. Production Economics, vol. 72, pp. 27-40, Jun. 2000.

Saaty T.L, Vargas L, “Models, Methods, Concepts and Applications of the Analytic Hierarchy Process,” Springer New York, 2001.

Özcan E.C., S. Ü., Eren Tamer, "A combined goal programming – AHP approach supported with TOPSIS for maintenance strategy selection in hydroelectric power plants," Renewable and Sustainable Energy Reviews, vol. 78, pp. 1410–1423,

Saaty T.L, “Group Decision Making and the AHP,” in The Analytic Hierarchy Process Applications and Studies, Bruce L. Golden Edward A. Wasil, Patrick T. Harker, Eds, Springer-Verlag, 1989, pp. 59-67.

CDF, “Manuals Superdecisions V3x,” CDF. [Online] Available: http://www.superdecisions.com/ . [Accessed: 15 May 2020]

Schrage L., Optimization Modelling with LINDO," Lindo System Inc., Fifth edition, 2002.

Mahasiswa Pendidikan Matematika dengan Regresi Logistik,” J. Kegur. dan Ilmu Pendidik., 2014.

D. R. Gujarati, Dasar-Dasar Ekonometrika, 1st ed. Jakarta: Erlangga, 2006.

N. R. Draper and H. Smith, Applied Regression Analysis, Third Edition. New York: John Wiley & Sons, 1998.




DOI: http://dx.doi.org/10.12962/j23546026.y2020i3.11232

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.