Method for Assessing Implementation of Design Build Project Delivery System in Indonesian Road Infrastructure Projects (Cases Study : Balai Besar Pelaksanaan Jalan Nasional V)
Abstract
Public infrastructure, particularly road infrastructure, has a strong linkage with the economic growth of a nation. Management of road infrastructure by the DG of Highways-Ministry for PW is currently implemented by using traditional methods of DBB contract system. Although DBB approach is considered more fair for the contractor, it may not be able to create more value for the Government. Long periods of procurement, often result in undesirable outcomes such as excessive cost, unsatisfactory quality and delays in implementation time. The DB project delivery system is expected to answer the above problem and therefore, there is a need to examine how to assess the feasibility of DB Contract implementation for road infrastructure projects under the authority of BBPJN V. This paper present the method assessment development
Keywords
Design and build (DB) project delivery system; implementation potential obstacles; supporting factors; road infrastructure projects under the authority of BBPJN V
Full Text:
PDFReferences
Departemen Pekerjaan Umum. "Bina Marga Akan Terapkan Kontrak Design & Build Proyek Jalan dan Jembatan.". 2009.
H. Suprayitno et al. “Konsep Dasar Metoda Pengukuran Kelayakan Penerapan Sistem Kontrak Baru”. Prosiding Seminar Nasional Manajemen Teknologi XXIII. Program MMT – ITS. 2015
Peraturan Pemerintah Republik Indonesia Nomor 29 Tahun 2000 tentang Penyelenggaraan Jasa Konstruksi.
H. Rahadian, Langkah Awal Menuju Performanced Based Contract Melalui Extended Warranty Period. 2009.
Undang-undang Republik Indonesia Nomor 18 Tahun 1999 tentang Jasa Konstruksi. 1999.
DOI: http://dx.doi.org/10.12962/j23546026.y2015i1.1134
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.