Risk Management of West Semarang Water Supply PPP Project: Public Sector Perspective

Jati Utomo Dwi Hatmoko, Riza Susanti

Abstract


While the need for water supply infrastructure development keeps increasing, many local governments of Indonesia are facing problems related to limited funding. This condition opens up an opportunity for private sector to invest in water supply infrastructure projects through Public Private Partnership (PPP) scheme. As this scheme is relatively new for many local governments in Indonesia, its complexity and typically long duration of the concession period may raise concerns of potential risks throughout the project life cycle. It is, therefore, very important for public sector as owner of the project to understand and to be able to manage risks properly throughout the concession period. The aim of this research is to evaluate risk management of West Semarang Water Supply PPP Project as perceived by public sector. The objectives are to identify, to analyze, and to allocate risks to the right parties. Qualitative and quantitative approaches have been used for the research method. Data were collected through focus group discussion involving 16 relevant officials of local government of Semarang, including its Regional Water Supply Company (PDAM). This research has identified a total of 66 risks as perceived by the public sector, which are then classified into 11 categories, e.g. political, operation, revenue, etc. The proportions of the level of risks are relatively balanced, as follows; low (37.88%), moderate (28.79%) and high (33.33%). In terms of risk allocation, 46.97% of risks are allocated to the public sector, while 37.88% and 15.15% of the risks are allocated to the private sector and shared by both parties, respectively. The results of this research are valuable for the local government of Semarang and can be used as a guidance in managing risks of the PPP project throughout the concession period.

Keywords


risks; public private partnership; water supply; West Semarang

Full Text:

PDF

References


Pangeran M.H, Pribadi K.S., Wirahadikusumah R.D., and Notodarmojo S, “Assessing Risk Management Capability of Public Sector Organizations related to PPP Scheme Development for Water Supply in Indonesia”, Civil Engineering Dimension, Vol. 14, No. 1, 26-35 ISSN 1410-9530 print / ISSN 1979-570X online, March, 2012

Marin P., “Public-private partnerships for urban water utilities: a review of experiences in developing countries”, World Bank Publications Vol. 8, 2009

BAPPENAS, “Report on Achievement of Millennium Development Goals”, BAPPENAS Publications, 2010

The Canadian Council for Public-Private Partnerships, “Why Choose PPP's?” available at http://www.pppcouncil.ca. accessed 20 December 2015

Cottle, G., Risks associated with public private partnership arrangements and private finance initiatives. Through the Looking Glass, 2003

Rahman M., Kumaraswamy M.M, “Risk management trends in the construction industry: moving towards joint risk management”, Journal Engineering, Construction and Architectural Management 2002(9) pp. 131-151, 2002

World Bank, “Potential Risks Of Public Private Partnerships”, available at http://ppp.worldbank.org/, accessed 16 December 2015

Ng, A. and Loosemore, M., “Risk allocation in the private provision of public infrastructure”, International Journal of Project Management, Vol 25 No. 1, pp. 66-76, 2007

Milner M, “Eurotunnel car traffic declines”, The Guardian, pp. 14, March, 2004

Andi, “The importance and allocation of risks in Indonesian construction projects”, Construction Management and Economics Vol. 24, pp. 69–80, Januari, 2006

Wibowo A. and Mohamed S., “Perceived Risk Allocation in Public-Private-Partnered (PPP) Water Supply Projects in Indonesia”, Construction in Developing Countries, pp.349, 2008

Project Management Institute, “A Guide to the Project Management Body of Knowledge (PMBOK) 4th edition”, Project Management Institute Inc: Pensylvania, 2008

IIGF, “Risk Allocation Guideline Public Private Partnership Edition: March 2015”, IIGF Publication, 2015

Bing L., Akintoye A., Edwards P.J. and Hardcastle, C., “ The allocation of risk in PPP/PFI construction projects in the UK”, International Journal of project management, Vol. 23 No.1 , pp.25-35, 2005




DOI: http://dx.doi.org/10.12962/j23546026.y2017i1.2191

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.