An Interesting Study of Capacity Improvement of a Shipyard in Myanmar

Aung Ye Kyaw, Djauhar Manfaat, Buana Ma’ruf

Abstract


Abstract¾ Six shipyards are in operation under control of Engineering Department of Inland Water Transport. Among them, Dalla shipyard currently accounts for about 50 percent of repair work on ships owned by the Inland Water Transport (IWT). The efficiency of the shipyard, which is about 164 years old, is hampered by old equipment, including some from the WWII-era (Word War II). Now the shipyard needs to be upgraded to improve its current capacity in ship repair. In this study, we proposed two ways which are supporting facilities and re-layout shipyard to increase ship repair. This paper obtains two alternative layouts of shipyard. The first alternative layout does not change the existing layout of shipyard but steel plate warehouse are built. The second alternative changes the existing layout because machine shop and steel plate warehouse is too far from the slipways. The first and second alternatives renovate zone 5 shop, carpenter shop, pipe and boiler shop and repair slipways.  The two alternatives have steel plate warehouse as well as the addition of two material handling equipment mobile crane and forklift. The second alternative re-locates new machine shop near the slip ways for better material handling and time consuming. The second alternative is the best alternative in terms of economically feasible, good flow of material and perfect of technical term and the most number of ship repairs. Then it can be improved capacity amount 1.43 times and docking time can be reduced from average 33 days to 27 days.


Keywords


shipyard; capacity; ship repair; facility and re-layout

Full Text:

PDF

References


Storch, R.L (1995). “Ship Production”. The Society Naval Architects and Marine Engineers

Than, C (2009). Myanmar Shipbuilding, Naval Architects and Marine Engineers. https://spruz.academia.edu/CharlieThan.

Celik, Metin. “Fuzzy Axiomatic Design-based Performance Evaluation Model for Docking Facilities in Shipbuilding Industry”. Applications 36:599–615, 2009.

Rafiy, Muhammad. “Study of Improvement Fishermen Welfare Through Improved Productivity And Model Development In The Costal North Konawa”, The International Journal of Engineering And Science (IJES), Vol 4, Issue 12: 62-67, 2015.

Chiang, C Y (2014). An empirically-simulated investigation of the impact of demand forecasting on the bullwhip effect: Evidence from U.S. auto industry, [Online] Available: www.sciencedirect.com.

Chabane, Hamid. “Design of Small Shipyard Facility Layout Optimized for Production and Repair”. Symposium International Journal, [Online] Available: http//www.metratech.net/spip.

Ray, Siddhartha (2008). Introduction to Material Handling, National institute of Technical Teachers’ Training and Research.

David, F. R. Strategic Management Concepts and Cases, (15th ed.) 2015, Prentice Hall, New York.

Chaiwat, P (2012). Economic Feasibility Evaluation of Government Investment Project by Using Cost Benefit Analysis: A Case Study of Domestic Port Port A), Laem-Chabang Port, Chonburi Province. Available online at www.sciencedirect.com

Ma’ruf, Buana (2006). Environmental-Based Strategic Management Model for Indonesia’s Medium-Sized Shipyards, Published in The Journal of Ship Production, Vol. 22, No. 4, November.




DOI: http://dx.doi.org/10.12962/j23546026.y2017i2.2307

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.