Requirement Engineering Analysis Based on Risk Assessment (Development of Management Information System for Domestic Wastewater in Gresik District)
Abstract
Keywords
Full Text:
PDFReferences
IEEE, IEEE Std 1220-1998, Standard for Application and Management of the Systems Engineering Process. IEEE, 1999.
I. Sommerville and P. Sawyer, Requirements Engineering : A Good Practice Guide. New York: John Wiley & Sons, 1999.
R. S. Wahono, “Analyzing requirements engineering problems,” in Proceedings of the IECI Japan Workshop, 2003.
P. Parviainen, H. Valtion teknillinen tutkimuskeskus., J. Kääriäinen, J. Takalo, and M. Tihinen, Requirements engineering : inventory of technologies. VTT Technical Research Centre of Finland, 2003.
D. Leffingwell and D. Widrig, Managing Software Requirements : A Unified Approach. Boston: Addison Wesley Professional, 1999.
J. Magnusson and B. Olsson, Affärssystem. Lund, Sweden: Studentlitteratur, 2010.
J. Parkinson, C. Lüthi, and Walther D. (GIZ), Sanitation21 - A Planning Framework for Improving City-wide Sanitation Services. IWA, Eawag-Sandec, GIZ, 2014.
L. Strande, M. Ronteltap, and D. Brdjanovic, Faecal Sludge Management: Systems Approach for Implementation and Operation. London, UK: IWA Publishing, 2014.
S. Amber, N. Shawoo, and S. Begum, “Determination of risk during requirement engineering process,” J. Emerg. Trends Comput. Inf. Sci., vol. 3, no. 3, pp. 358–364, 2012.
K. Boness, A. Finkelstein, and R. Harrison, “A lightweight technique for assessing risks in requirements analysis - IET Journals & Magazine,” IET Softw., vol. 2, no. 1, pp. 46–57, 2008.
Y. Asnar, P. Giorgini, and J. Mylopoulos, “Goal-driven risk assessment in requirements engineering,” Requir. Eng., vol. 16, no. 2, pp. 101–116, Jun. 2011.
S. Bhukya and S. Pabboju, “Innovative of risk analysis in requirement engineering,” Mater. Today Proc., vol. 5, no. 1, pp. 1718–1730, Jan. 2018.
K. Curcio, T. Navarro, A. Malucelli, and S. Reinehr, “Requirements engineering: A systematic mapping study in agile software development,” J. Syst. Softw., vol. 139, pp. 32–50, May 2018.
K. V. Sharma and P. V. Kumar, “A method to risk analysis in requirement engineering using tropos goal model with optimized candidate solutions,” Int. J. Comput. Sci., vol. 10, no. 6, pp. 250–259, 2013.
DOI: http://dx.doi.org/10.12962/j23546026.y2019i5.6305
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.