Analysis of Off Highway Truck Caterpillar 773E General Overhaul (GOH) Interval
Abstract
Keywords
Full Text:
PDFReferences
PMI (Project Management Institute), “PMBOK Guide 5th Edition,” 2013.
I. Soeharto, Manajemen Proyek dari Konseptual Sampai Operasional. Jakarta: Penerbit Erlangga, 2012.
S. Siswanto, Operation Research. Jakarta: Erlangga, 2007.
J. Heizer and B. Render, Operation Management, 7th ed. New Jersey: Prentice Hal, Inc, 2005.
H. K. Atmaja, “Penggunaan Analisis ABC Indeks Kritis untuk Pengendaliaan Persediaan Obat Antibiotik di Rumah Sakit M. H. Thamrin Salemba,” Universitas Indonesia, 2012.
J. Barabady and U. Kumar, “Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran,” Reliab. Eng. Syst. Saf., vol. 93, no. 4, pp. 647–653, Apr. 2008.
Y. Satria, “Analisa Penentuan Interval Waktu Penggantian Komponen Kritis pada Alat Instumentasi QSC Scanner Type 2200-2 di PT Pabrik Kertas Tjiwi Kimia,” Institut Teknologi Sepuluh Nopember, 2012.
T. H. Putra, “Penentuan Interval Waktu Penggantian Sub-Sub System pada Mesin Heidelberg CD 102 di PT X,” Institut Teknologi Sepuluh Nopember, 2013.
W. Febrianti, “Penentuan Interval Waktu Perawatan Pencegahan pada Peralatan Sub Unit Sintesa Unit Urea di PT. X menggunakan Simulasi Monte Carlo,” Institut Teknologi Sepuluh Nopember, 2016.
M. E. M. Arputharaj, “Studies on Availability and Utilisation of Mining Equipmente - An Overview,” Int. J. Adv. Res. Eng. Technol., 2015.
DOI: http://dx.doi.org/10.12962/j23546026.y2019i5.6329
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.