Analysis of Off Highway Truck Caterpillar 773E General Overhaul (GOH) Interval

Muhammad Ruspinuji, Nani Kurniati

Abstract


PT XYZ is a heavy equipment rental company and mining contractor. One of its working areas is an open coal mine in South Kalimantan, obtained a contract to lease heavy equipment in the form of 14 (fourteen) Caterpillar 773E Off Highway Trucks. Mine owner have availability targets and application of penalties, PT XYZ must implement appropriate maintenance and maintenance strategies. In 2018, the OHT total down time is 34,061.30 hours. For 15,272.00 hours (44.8%) downtime is caused by major component breakdown. The high cost of repairing components makes it difficult for company management to determine the decision to repair. To meet the heavy equipment availability target of mine owner, PT XYZ must implement appropriate maintenance and maintenance strategies. High off Highway Truck (OHT) availability can be achieved by minimizing downtime. The purpose of this research is to determine a general overhaul (GOH) time interval that has the greatest effect on the availability of Caterpillar 773E Off Highway Truck. In order for minimization of downtime to have a significant impact, it must be determined which critical components have the most influence on costs. Next step is determined the GOH interval by considering the smallest cost impact. The results of research show Caterpillar 773E OHT critical components are engine, transmission, final drive and torque converter. The GOH interval is 17,992.81 hours

Keywords


availability; heavy equipment; off highway truck; general overhaul; interval; critical component

Full Text:

PDF

References


PMI (Project Management Institute), “PMBOK Guide 5th Edition,” 2013.

I. Soeharto, Manajemen Proyek dari Konseptual Sampai Operasional. Jakarta: Penerbit Erlangga, 2012.

S. Siswanto, Operation Research. Jakarta: Erlangga, 2007.

J. Heizer and B. Render, Operation Management, 7th ed. New Jersey: Prentice Hal, Inc, 2005.

H. K. Atmaja, “Penggunaan Analisis ABC Indeks Kritis untuk Pengendaliaan Persediaan Obat Antibiotik di Rumah Sakit M. H. Thamrin Salemba,” Universitas Indonesia, 2012.

J. Barabady and U. Kumar, “Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran,” Reliab. Eng. Syst. Saf., vol. 93, no. 4, pp. 647–653, Apr. 2008.

Y. Satria, “Analisa Penentuan Interval Waktu Penggantian Komponen Kritis pada Alat Instumentasi QSC Scanner Type 2200-2 di PT Pabrik Kertas Tjiwi Kimia,” Institut Teknologi Sepuluh Nopember, 2012.

T. H. Putra, “Penentuan Interval Waktu Penggantian Sub-Sub System pada Mesin Heidelberg CD 102 di PT X,” Institut Teknologi Sepuluh Nopember, 2013.

W. Febrianti, “Penentuan Interval Waktu Perawatan Pencegahan pada Peralatan Sub Unit Sintesa Unit Urea di PT. X menggunakan Simulasi Monte Carlo,” Institut Teknologi Sepuluh Nopember, 2016.

M. E. M. Arputharaj, “Studies on Availability and Utilisation of Mining Equipmente - An Overview,” Int. J. Adv. Res. Eng. Technol., 2015.




DOI: http://dx.doi.org/10.12962/j23546026.y2019i5.6329