Delay Identification of the HVAC Project on West Madura Offshore Oil Company Using the House of Risk Method
Abstract
Keywords
Full Text:
PDFReferences
P. K. Maheshbhai, R. Bhatt, and J. J. Bhavsar, “A Study of Risk Factors Affecting Building Construction Projects,” Int. J. Eng. Res. Technol., vol. 3, no. 12, pp. 831–835, 2014.
M. Porowski, “The optimization method of HVAC system from a holistic perspective according to energy criterion,” Energy Convers. Manag., vol. 181, pp. 621–644, 2019, doi: 10.1016/j.enconman.2018.11.069.
J. M. Nicholas and H. Steyn, Project Management for Engineering, Business and Technology, 5th ed. London: Taylor & Francis Group, 2017.
S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” Int. J. Proj. Manag., vol. 24, no. 4, pp. 349–357, 2006, doi: 10.1016/J.IJPROMAN.2005.11.010.
I. N. Pujawan and L. H. Geraldin, “House of risk: a model for proactive supply chain risk management,” Bussiness Process Manag. J., vol. 15, no. 6, pp. 953–967, 2009.
I. P. A. Wiguna and S. Scott, “Nature Of The Critical Risk Factors Affecting Project Performance In Indonesian Building Contracts,” in 21st Annual ARCOM Conference, 2005, pp. 225–235.
S. A. A. Mosaad, U. H. Issa, and M. S. Hassan, “Risks affecting the delivery of HVAC systems: identifying and analysis,” J. Build. Eng., vol. 16, no. Maret, pp. 20–30, 2018, doi: 10.1016/j.jobe.2017.12.004.
DOI: http://dx.doi.org/10.12962/j23546026.y2020i6.8899