Delay Identification of the HVAC Project on West Madura Offshore Oil Company Using the House of Risk Method

Gunawan Kunto Bhasworo, Ervina Ahyudanari

Abstract


This research is focused on the analysis of delays or risks to the implementation of the "Procurement and Installation HVAC Installation" contract at West Madura Offshore Oil Company, which has a working area in the Offshore area. This study uses the HOR (House of Risk) method as an alternative to the ISO31000: 2009 risk management method that has been used internally by West Madura Offshore Oil Company The basis for selecting the HOR (House of Risk) method is the existence of a tool to see the impact (severity) and relations (relations) between the event of a delay and the factoring agent. In identification of the cause of the delay the method used are collecting data primary through Focus Group Discussion between Internal Expert and Secondary data which use project data for Offshore HVAC Project in the period of the year 2016-2018. The HOR (House of Risk) method in conducting this process is presented as follow review historical data and related document, Focus Group Discussion as information gathering techniques, Risk analysis and Risk Register. There are five significant risks from the results of research using the HOR (House of Risk) method, namely Poor-quality shop and coordination drawings, weather constraints, limited quantity and quality of HR (contractors and subcontractors), Absence of duct fabrication workshops at the site and lack of communication between contractor and subcontractor.

Keywords


Risk Management; House Of Risk; HVAC; Delay Analysis; Offshore.

Full Text:

PDF

References


P. K. Maheshbhai, R. Bhatt, and J. J. Bhavsar, “A Study of Risk Factors Affecting Building Construction Projects,” Int. J. Eng. Res. Technol., vol. 3, no. 12, pp. 831–835, 2014.

M. Porowski, “The optimization method of HVAC system from a holistic perspective according to energy criterion,” Energy Convers. Manag., vol. 181, pp. 621–644, 2019, doi: 10.1016/j.enconman.2018.11.069.

J. M. Nicholas and H. Steyn, Project Management for Engineering, Business and Technology, 5th ed. London: Taylor & Francis Group, 2017.

S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” Int. J. Proj. Manag., vol. 24, no. 4, pp. 349–357, 2006, doi: 10.1016/J.IJPROMAN.2005.11.010.

I. N. Pujawan and L. H. Geraldin, “House of risk: a model for proactive supply chain risk management,” Bussiness Process Manag. J., vol. 15, no. 6, pp. 953–967, 2009.

I. P. A. Wiguna and S. Scott, “Nature Of The Critical Risk Factors Affecting Project Performance In Indonesian Building Contracts,” in 21st Annual ARCOM Conference, 2005, pp. 225–235.

S. A. A. Mosaad, U. H. Issa, and M. S. Hassan, “Risks affecting the delivery of HVAC systems: identifying and analysis,” J. Build. Eng., vol. 16, no. Maret, pp. 20–30, 2018, doi: 10.1016/j.jobe.2017.12.004.




DOI: http://dx.doi.org/10.12962/j23546026.y2020i6.8899

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.