Analysis of Sling Tension on the Lifting Process of Riser Support Jacket on Installation Phase

Rifki Mahardi, Yoyok Setyo Hadiwidodo, Rudi Walujo Prastianto

Abstract


The increasing exploration and exploitation of oil and gas in the deep sea has led to an increasing need for new technologies to support these activities. In this study, a riser support structure in the form of a jacket is used to support the riser so that the stress can be minimized. Like the jacket structure in general, this riser support structure can be installed using various methods, including the lifting method. This study discusses the stress in the sling when the lifting process is carried out. The crane barge used in this study was first modeled using MOSES Software to determine how the barge moves when the lifting process is carried out. The result of the barge movement analysis is a Response Amplitude Operator (RAO). In the sway, heave and roll movements, it is known that the maximum value is at 90° heading, while in other movements, it varies. The riser support structure is modeled using SACS Software to determine the center of gravity, then the sling length is calculated. From the calculation, the sling length at lifting point 1 is 34,10 m, lifting point 2 is 34,14 m, lifting point 3 is 36,08 m, and lifting point 4 is 36,10 m. The lifting model is input into the OrcaFlex Software to analyze the sling stress. The analysis was performed in five loading directions, namely 0°, 45°, 90°, 135°, and 180°. The maximum stress occurs in the loading direction of 90°, with the result that sling 1 is 1932,70 kN, sling 2 is 1905,65 kN, sling 3 is 1161,64, and sling 4 is 1193,65 kN.

Keywords


Riser Support Jacket, RAO, Lifting, Sling

Full Text:

PDF

References


Chakrabarti, S, K, 2005, Handbook of Offshore

Engineering Volume I, 1st ed, U, K: Elsevier.

Coric V, Ivan Catipovic, Vedran Slapnicar, 2014,

Floating Crane Response in Sea Waves, Ship Building,

Volume 65 No, 2.

Nielsen, F, G, 2007, Lecture Notes in Marine

Operations, Department of Marine Hydrodynamics,

Faculty of Marine Technology, Norwegian University

of Science and Technology, Trondheim/Bergen

January 2007.

Kurniawan, Vebby A, 2020, Analysis of Rigging

Variations on The Lifting Stage of Decommissioning

Process: Study Case The 'L-PRO' Platform, Surabaya:

Department of Ocean Engineering, Faculty of Marine

Technology, Sepuluh Nopember Institute of

Technology.

Pramita, H, G, 2013, Analysis of Padeye Structure on

The Lifting Process of 4 Leg Jacket with Dynamic

Approach, Surabaya: Department of Ocean

Engineering, Faculty of Marine Technology, Sepuluh

Nopember Institute of Technology.

Djatmiko, E, B, 2012, Perilaku dan Operabilitas

Bangunan Laut di Atas Gelombang Acak, Surabaya:

ITS Press.

Li Liang, 2004, Heavy Lift Installation Study of

Offshore Structure, Singapore: Thesis of Department of

Civil Engineering, Notional University of Singapore.

Beretta, Mark G, J, 2005, Heavy-Lift Sling and

Grommet Technology Course, U. K.: Kim Teck Leong

Offshore Pte Ltd.

J, Ray McDermott Engineering, 2009, Derrick Barge

Trim & Stability Book, Singapore: ABS Singapore




DOI: http://dx.doi.org/10.12962/j25800914.v8i1.20463

Refbacks

  • There are currently no refbacks.


Contact:

IJOCE Editor
Department of Ocean Engineering
Institut Teknologi Sepuluh Nopember (ITS)
Kampus ITS - Sukolilo
Surabaya 60111 - Indonesia
Phone/Fax: +62-31-592 8105
e-mail: ijoce@its.ac.id
           ijoce.oe.its@gmail.com

 


International Journal of Offshore and Coastal Engineering by Department of Ocean Engineering is licensed under a Creative Commons Attribution 4.0 International.

  Lisensi Creative Commons

Based on a work at https://iptek.its.ac.id/index.php/ijoce/index.

klik4d