Analysis of Sling Tension on the Lifting Process of Riser Support Jacket on Installation Phase

Rifki Mahardi, Yoyok Setyo Hadiwidodo, Rudi Walujo Prastianto

Abstract


The increasing exploration and exploitation of oil and gas in the deep sea has led to an increasing need for new technologies to support these activities. In this study, a riser support structure in the form of a jacket is used to support the riser so that the stress can be minimized. Like the jacket structure in general, this riser support structure can be installed using various methods, including the lifting method. This study discusses the stress in the sling when the lifting process is carried out. The crane barge used in this study was first modeled using MOSES Software to determine how the barge moves when the lifting process is carried out. The result of the barge movement analysis is a Response Amplitude Operator (RAO). In the sway, heave and roll movements, it is known that the maximum value is at 90° heading, while in other movements, it varies. The riser support structure is modeled using SACS Software to determine the center of gravity, then the sling length is calculated. From the calculation, the sling length at lifting point 1 is 34,10 m, lifting point 2 is 34,14 m, lifting point 3 is 36,08 m, and lifting point 4 is 36,10 m. The lifting model is input into the OrcaFlex Software to analyze the sling stress. The analysis was performed in five loading directions, namely 0°, 45°, 90°, 135°, and 180°. The maximum stress occurs in the loading direction of 90°, with the result that sling 1 is 1932,70 kN, sling 2 is 1905,65 kN, sling 3 is 1161,64, and sling 4 is 1193,65 kN.

Keywords


Riser Support Jacket, RAO, Lifting, Sling

Full Text:

PDF

References


Chakrabarti, S, K, 2005, Handbook of Offshore

Engineering Volume I, 1st ed, U, K: Elsevier.

Coric V, Ivan Catipovic, Vedran Slapnicar, 2014,

Floating Crane Response in Sea Waves, Ship Building,

Volume 65 No, 2.

Nielsen, F, G, 2007, Lecture Notes in Marine

Operations, Department of Marine Hydrodynamics,

Faculty of Marine Technology, Norwegian University

of Science and Technology, Trondheim/Bergen

January 2007.

Kurniawan, Vebby A, 2020, Analysis of Rigging

Variations on The Lifting Stage of Decommissioning

Process: Study Case The 'L-PRO' Platform, Surabaya:

Department of Ocean Engineering, Faculty of Marine

Technology, Sepuluh Nopember Institute of

Technology.

Pramita, H, G, 2013, Analysis of Padeye Structure on

The Lifting Process of 4 Leg Jacket with Dynamic

Approach, Surabaya: Department of Ocean

Engineering, Faculty of Marine Technology, Sepuluh

Nopember Institute of Technology.

Djatmiko, E, B, 2012, Perilaku dan Operabilitas

Bangunan Laut di Atas Gelombang Acak, Surabaya:

ITS Press.

Li Liang, 2004, Heavy Lift Installation Study of

Offshore Structure, Singapore: Thesis of Department of

Civil Engineering, Notional University of Singapore.

Beretta, Mark G, J, 2005, Heavy-Lift Sling and

Grommet Technology Course, U. K.: Kim Teck Leong

Offshore Pte Ltd.

J, Ray McDermott Engineering, 2009, Derrick Barge

Trim & Stability Book, Singapore: ABS Singapore




DOI: http://dx.doi.org/10.12962/j25800914.v8i1.20463

Refbacks

  • There are currently no refbacks.


Link Toto Slot Gacor https://journal.uib.ac.id/pagedata/ https://rs-amino.jatengprov.go.id/wp-content/database/ https://rs-amino.jatengprov.go.id/agent/ https://rs-amino.jatengprov.go.id/sites/

Contact:

Pusat Publikasi Ilmiah LPPM Instutut Teknologi Sepuluh Nopember
Department of Ocean Engineering
Institut Teknologi Sepuluh Nopember (ITS)
Kampus ITS - Sukolilo
Surabaya 60111 - Indonesia
Phone/Fax: +62-31-592 8105
e-mail: ijoce@its.ac.id
           ijoce.oe.its@gmail.com

 


International Journal of Offshore and Coastal Engineering by Department of Ocean Engineering is licensed under a Creative Commons Attribution 4.0 International.

  Lisensi Creative Commons

Based on a work at https://iptek.its.ac.id/index.php/ijoce/index.

bni4d

klikjp

https://klik4dx.id/

klik4d login

mawar4d

rajajp188

raffi88

raffi888

klik4d

mpo1212

slot scatter hitam

22crown

22crown

slot gacor

22crown

22crown

22crown

POSKOBET POSKOBET POSKOBET POSKOBET SUNDA787 SUNDA787 ASIABET777 ASIABET777 POSTOTO787 POSTOTO787 POSTOTO787 EMAS787 klik4d klik4d

slot server thailand

Raffi 888

klik4d

akun togel

nobitabet

22crown loginslot

slot 4d

Agen Slot gacor

slot qris