Cover
Abstract
Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression
Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550
Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar & Reza Kazhimi
The Effect of Prefabricated Vertical Drain Length on Soft Soil Settlement (Case Study: The North Ring Road of Lamongan STA. 3+200)
Henniko Okadha, Herman Wahyudi, Yudhi Lastiasih & Sifa' Udukha
Analysis of Excavated Soil Utilization as Embankment Material and Foundation Layer on Singaraja – Mengwitani Road Section (BALI)
Dinul Hadi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya & Noor Fachrie
Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426
Fanny Rumintha Br Barimbing, Yudhi Lastiasih, Herman Wahyudi & Sifa` Udukha
Determination of Building Assets and Equipment Requirements Based on Sustainable Warehouse Cencepts for PT Kansai Prakarsa Coatings
Putri Dewi Purnama & Halla Nur Azizah
Full Text:
PDFDOI: http://dx.doi.org/10.12962/jifam.v7i0.22491
Refbacks
- There are currently no refbacks.
Visitor :
Flag Counter
Journal Of Infrastructure & Facility Asset Management by Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.