Analysis of Project Performance Criteria for Design and Build Contract

Taurista Yuristanti, I Putu Artama Wiguna, Herry Budianto

Abstract


The design and build (DB) project delivery system recently begins to be widely used for road projects in Indonesia. It has some advantages such as shorter completion time, lower cost growth, lower schedule growth, and better performance in terms of quality. The complexity of DB projects and the lack of complete rules and regulations in this field have caused the implementation of DB projects to face various challenges and problems. Thus, DB projects need to be evaluated to improve their performance. The purpose of this study is to provide the concept of DB project performance, performance criteria, and performance indicators that used to carry out a performance assessment. The analysis was done based on a literature review and interviews. There are fifteen indicators generated from this analysis. The indicators divided into three parts: design phase performance, construction phase performance, and overall project performance and three criteria: results quality, resource usage, and objectives achieved.

Full Text:

PDF

References


Alam, T. (2011). Identifikasi Faktor-faktor Risiko Proyek Rancang Bangun (Design and Build) pada PT. XYZ yang Berpengaruh terhadap Kinerja Waktu. Tesis Pasca Sarjana. Universitas Indonesia.

Chan, A.P.C. & Chan, A.P.L. (2004). “Key Performance Indicators for Measuring Construction Success”. Benchmarking: An International Journal, vol. 11, issue:2, p. 203-221.

Chen, Q., Jin, Z., Xia, B., Wu, P. & Skitmore, M. (2016). “Time and Cost Performance of Design-Build Projects”. Journal of Construction Engineering and Management, vol 142, issue:2, p. 1-20.

Gransberg, D.D. & Molenaar, K. (2004). “Analysis of Owner’s Design and Construction Quality Management Approaches in Design/ Build Projects”. Journal of Management in Engineering, vol 20, issue:4, p. 162-169.

Hafidy, H. (2010). “Analisa Kinerja dengan Metode Earned Value pada proyek Pembangunan Pelabuhan Laut Boom Tahap I Kabupaten Banyuwangi Jawa Timur”. Tesis Pasca Sarjana. Institut Teknologi Sepuluh Nopember.

Hale, D.R., Shrestha, P.P., Gibson, Jr. G.E. & Migliaccio, G.C. (2009). “Empirical Comparison of Design/ Build and Design/ Bid/ Build Project Delivery Methods”. Journal of Construction Engineering and Management, vol. 135, issue:7, p. 579-587.

Ikediashi, D.I., Mendle, A., Achuenu, E. & Oladokun, M.G. (2012). “Key Performance Indicators of Design and Build Projects in Nigeria”. Journal of Human Ecology, vol. 37, issue:1, p. 37-46.

Lauras, M., Marques, G. & Gourc, Didier (2010). “Towards a multi-dimensional project Performance Measurement System”. Decision Support Systems, vol. 48, issue:2, p. 342-353.

Lim, S.K. (2009). “Framework and Processes for Enhancing Sustainability Deliverables in Australian Road Infrastructure Projects”. Thesis. The Queensland University of Technology.

Nawi, M.N.M, Nifa, F.A.A. & Ahmed, V. (2014). “A Review of Traditional Project Procurement Towards Integrated Practice”. American-Eurasian Journal of Sustainable Agriculture, vol. 8, issue:2, p. 65-70.

Ojo, S.O., Aina, O. & Adeyemi, A.Y. (2011). “A Comparative Analysis of The Performance of Traditional Contracting and Design-Build Procurements on Client Objectives in Nigeria”. Journal of Civil Engineering and Management, vol. 17, issue:2, p. 227-233.

PerMen Pupera 1/20. Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 1 Tahun 2020 tentang Standar dan Pedoman Pengadaan Pekerjaan Konstruksi Terintegrasi Rancang Bangun melalui Penyedia

Ratnasabapathy, S. & Rameezdeen, R. (2006). “Design-Bid-Build Vs Design-Build Projects: Performance Assessment of Commercial Projects in Sri Lanka”. Proc. Symp. on sustainability and Value through construction procurement CIB W092. Salford: The Digital World Centre. p. 474-481.

Suprayitno, H. & Soemitro, R.A.A. (2018). “Preliminary Reflexion on Basic Principle of Infrastructure Asset Management”. Jurnal Manajemen Aset Infrastruktur dan Fasilitas, vol. 2, no. 2, hal. 1-13.

Takim, R. & Adnan, H. (2008). “Analysis of Effectiveness Measures of Construction Project Success in Malaysia”. CCSE Asian Social Science, vol. 4, issue:7, p. 74-91.

Takim, R. & Akintoye, A. (2002). “Performance Indicators for Successful Construction Project Performance”. Proc. in 18th Annual ARCOM Conference, Association of Researchers in Construction Management. ed Greenwood D (Newcastle: University of Northumbria). p. 545-555.

Yunianto, D., Hatmoko, J.U.D. & Hidayat, A. (2014). “Evaluasi Penerapan Constructability pada Proyek Konstruksi Bangunan Gedung”. Jurnal MKTS Ilmu dan Terapan Bidang Teknik Sipil, vol. 20, no. 2, hal. 135-144.




DOI: http://dx.doi.org/10.12962/jifam.v2i2.6945

Refbacks

  • There are currently no refbacks.


 

Visitor :

Author Affiliate Statistics

View My Stats

 

 Flag Counter

Flag Counter


  

 

Creative Commons License
Journal Of Infrastructure & Facility Asset Management by Institut Teknologi Sepuluh Nopember is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.