Table of Contents
Articles
| Handling Selection of Settlement and Embankment Stability Issues Based on Variations in Embankment Height and Soft Subgrade Thickness Case Study: Pekanbaru Junction - Pekanbaru Bypass Sta. 176+775 - Sta. 176+975 | |
| Pandu Hermawan, Noor Endah Mochtar, Indrasurya B. Mochtar, Mahar Muliawan |
| Slope Stability Analysis Under Dry-Wetting Cycle Conditions (Case Study: Landslide Countermeasure of Batas Pidie/Aceh Besar - Batas Kota Sigli) | |
| Zulfadhli Zulfadhli, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro, Fikri Afzal |
| Alternative Planning Slope Stabilization on Roadway Case Study : Landslide on Tabone-Polewali Road Section KM 168+790 to 168+820 | |
| Ismi Istiqamah, Mohamad Khoiri, Mahendra Andiek Maulana, Bambang S. Razak |
| Study of The Behavior of Abutment Piled Foundation due to Nearby Staged Embankment (Case Study: Kali Kandang Bridge on The North Ring Road of Lamongan) | |
| Azkiya Nabila, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro, Sifa Udukha |
| Behaviour Study of Abutment Foundation Pile on Lightweight Embankment Oprit (Case Study: Kali Otek Bridge – Lamongan North Ring Road Construction Package Section 2) | |
| Nila Wahyu Pertiwi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya, Sifa’ Udukha |
Covers
| Cover | |
| Journal of Infrastructure & Facility Asset Management |
| Editorial | |
| Journal of Infrastructure & Facility Asset Management |
| Reviewer | |
| Journal of Infrastructure & Facility Asset Management |
| Closure | |
| Journal of Infrastructure & Facility Asset Management |
ISSN: 2656-8896



