Table of Contents
Articles
| Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550 | |
| Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar, Reza Kazhimi |
| The Effect of Prefabricated Vertical Drain Length on Soft Soil Settlement (Case Study: The North Ring Road of Lamongan STA. 3+200) | |
| Henniko Okadha, Herman Wahyudi, Yudhi Lastiasih, Sifa’ Udukha |
| Analysis of Excavated Soil Utilization as Embankment Material and Foundation Layer on Singaraja – Mengwitani Road Section (BALI) | |
| Dinul Hadi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya, Noor Fachrie |
| Analysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426 | |
| Fanny Rumintha Br Barimbing, Yudhi Lastiasih, Herman Wahyudi, Sifa` Udukha |
| Determination of Building Assets and Equipment Requirements Based on Sustainable Warehouse Cencepts for PT Kansai Prakarsa Coatings | |
| Putri Dewi Purnama, Halla Nur Azizah |
Covers
| Cover | |
| Journal of Infrastructure & Facility Asset Management |
| Editorial | |
| Journal of Infrastructure & Facility Asset Management |
| Reviewer | |
| Journal of Infrastructure & Facility Asset Management |
| Closure | |
| Journal of Infrastructure & Facility Asset Management |
ISSN: 2656-8896



