Analysis of Root Causes of Fire in Coal Fired Power Plant Using FMEA Study Case Method at PT. PJB UBJOM PACITAN
Abstract
Keywords
Full Text:
PDFReferences
. M. M. Hanafi, Manajemen Risiko, Yogyakarta.: UPP STIM YKPN, 2014.
. G. C. Constantinescu, “A comparative critical study between FMEA and FTA risk analysis methods,” IOP Conference Series: Materials Science and Engineering, p. 252, 2017.
. Chrysler Corporation, General Motors Corporation, Potential Failure mode and Effects Analysis Fourth Edition, Southamton Hampshire: Chrysler LLC, Ford Motor Company, General Motors Corporation, 2008.
. Andrawina dan R. Ernawati, “Analisis Terjadinya Swabakar serta Penananganan Swabakar di Temporary Stockpile Pit 1 C TE-5900 HS Area Banko Barat di PT. Bukit Asam Tanjung Enim,” Seminar Nasional Sains dan Teknologi Terapan VII , pp. 489-494, 2019.
. M. Y. H. E. H. Syahrul S, “The Effectiveness of Compaction Method to Prevent Spontaneos Combustion in
. Temporary stockpile at PT. Bukit Asam (Persero) TBK Tanjung Enim,” FTKE - Usakti, 2018.
. D. L. L. Sloss, Assessing and managing spontaneous combustion of coal, London: IEA Clean Coal Centre, 2015.
. A. Zuniawan dan I. K. Sriwana, “Handling of Coal dust at Coal Handling Facility In coal Power Plant Using Soft
. System Methodology (SSM) Approach,” Sinergi Vol. 23, No. 3, pp. 223-232, 2019.
DOI: http://dx.doi.org/10.12962/j23546026.y2020i3.11079
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.