Property Development Risk Analysis Mandalika Resort Lombok Tourism Area

I Wayan Muka

Abstract


The role of the property sector to the national economy is very important. Not only its role in absorbing labor but also contributions to improving national economic growth. Great relevance to other sectors of the economy also makes the property sector requires strict protection and supervision of various parties, especially the government. It aims to prevent systemic risk due to the fall of the property sector to other economic sectors. Risks and uncertainties always occur in property development. The risk of an effect on every stage of the process of the development of ideas, feasibility studies, commitment to the construction and operation phase. The risk management process is generally a continuous and iterative process, even every kind of development is different and unique properties. This study aims to identify sources of risk, risk factors, the level of hazard, vulnerability level, the level of capacity and determine the priority risks in property development process. Steps being taken in this study include: the identification of sources of risk, the stage of identification of risk factors, the stage of identification of the level of hazard, the stage of identification of the level of vulnerability, the stage of identification of the level of capacity, the stage of risk analysis and risk priority index ( IPR). Conceptually, the proposed method in this study refers to the key measures of risk management that includes identification, qualitative risk analysis in the process of property development. Data collected through interviews and questionnaires by resource persons involved in property development in the tourism area Mandalika Resort Lombok in West Nusa Tenggara Province. Results of research on the development of the area Mandalika Resort Lombok can be concluded that the stages of development that are most at risk is the stage of an idea (IPR = 0.152), followed by the stage of feasibility (IPR = 0.067), then the commitment stage (IPR = 0,036), construction (IPR = 0.026) and stage management (IPR = 0.010). The results of this assessment indicate that the idea stage is the stage of development of the property are recommended to get treatment or priority risk response. Concluded the process of property development in the region Mandalika Resort Lombok is not worth continuing before risk mitigation that is unacceptable

Keywords


Property Development; Risk Analysis

Full Text:

PDF

References


Armaini (2006), Quantitative risk analysis of real estate investments in the city of Denpasar. Thesis Masters Degree in Civil Engineering University of Udayana.

Brodjonegoro, PS, 1991. The Analytic Hierarchy Process and Risk ethod. Jakarta: SaptaUtama

Cooper, DF, DH Macdonald and Chapman, CB 1987. Risk Analysis for Large Project, John Wiley & Sons Ltd., Norwich.

Dikmen, I, Birgonul, T. 2006. An analytical process-based models for risk opportunity assessment of international construction projects, Canadian Journal of Civil Engineering.

Djojosoedarsono, S. 2003. Principles of Risk Management and Insurance, Salemba Four, Jakarta

Ezell, B., Farr, J.and Wiese, I. 2000. Infrastructure risk analysis models, Journal of Infrastructure sytem, 6 (3), 114-117

ISDR. 2002. Words into Action:aguide for implementing the Hyogo Framework

Gehner et al. 2006. Risk management in the Dutch real estate development sector: a survey ", Proceedings of the 6th International postgraduate research conference in the built and human environment. University of Salford, UK.

Kerzner, H. Management of Project 1998: A Systems Approach to a Planning, Scedulling and controlling. 6thed.

Peiser, R.B. and Frej, AB 2003. Professional Real Estate Development.The ULI Guide to the Business, Washington D.C.

Rafitas, AB 2005. Kiat Sukses Bisnis Broker Properti. Bumi Aksara, Jakarta

Sarewitz, D., Pielke, Jr.R.and Keykhah, M. 2003.Vulnerability and risk: Some thoughts from a political and policy perspective. Risk Analysis, 23 (4), 805-10

Thomas.A.2008.Property management businesses in entering the market: A case study on PT. Petrimeq. Tesis.Universitas Indonesia

Zhang, H. 2007. A redefinition of the project risk process: using vulnerability to open up the event concequence link ", International Journal of Project Management.




DOI: http://dx.doi.org/10.12962/j23546026.y2017i1.2190

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.