The Success of Local Contractors in The Procurement of Construction Projects in Kendari, South East Sulawesi, Indonesia

M. Akbar Kurdin, La Welendo, Rifa’i Maulana

Abstract


This study aims to identify the diverse formulation of the problem related to the success of winning the construction project procurement for local construction company in Kendari. The urgency of this study is to answer the factors that determine the success of local contractors in the construction project procurement process in Kendari. The method used in this study is a statistical analysis method. Dimensions are used to measure success in the procurement of construction projects in this research is the company's experience, equipment and tools, human resources, process control, reputation / achievement contractors, financial, project organization, workplace safety. Dimensions is formulated into 22 variables to be measured. From the findings of research on the variables that influence the success of winning the procurement of construction project in Kendari obtained linear regression models, namelyY = -0,401 + 0,448 X2 + 0,576X14 + 0,273X12. The analysis results obtained from the dominant factors that influence the success of winning the construction procurement namely a kind of work that have been done, the project owner relationship with the contractor, and the methods and strategy implementation and control of the work to be done.

Keywords


Procurement,; Construction Project; Local Contractor

Full Text:

PDF

References


D.S. Barrie, B. C. Paulson. 1992. Professional Construction Management. McGraw-Hill Publishing Company

E.J.Jaselskis, A. Talukhaba. 1998 Bidding Consideration in Developing Countries. Journal of Construction Engineering and Management. Volume 124

Decree of the President of the Republic of Indonesia Number 80 Year 2003 on Guidelines for Procurement of Government Goods / Services

G.D. Hold, P.O. Olomolaiye, F.C. Harris. 1994. Evaluating Performance Potential in the Selection of Construction Contractors. Engineering. Construction and Architectural Management

Government Regulation No. 85 Year 2006 on Guidelines for Procurement of Government Goods / Services Sixth Amendment on Presidential Decree No. 80 of 2003

I. Dipohusodo. 1996. Manajemen Proyek Dan Konstruksi Jilid 1. Penerbit Kanisius,Yogyakarta.

JS. Russell, MJ. Skibniewski. 1988. Decision Criteria in Contractor Prequalification. Journal Of Construction Engineering And Management vol.4, No.2, pp. 148-164

Regulation of the President of the Republic of Indonesia Number 54 of 2010 Concerning the Procurement of Goods / Services

Presidential Decree No. 70 of 2012 On the second amendment to the Presidential Decree Number 54 Year 2010 concerning Procurement of Government Goods and Services

Reza Febriano. 2006. Determination of Weight Assessment Work Bid Evaluation Criteria in Works in PT Jasa Marga (Persero) Using AHP. Thesis Graduate Program in Engineering. Indonesia University

W.I Ervianto. 2004. Manajemen Proyek Konstruksi. Penerbit Andi. Yogyakarta




DOI: http://dx.doi.org/10.12962/j23546026.y2017i1.2192

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.