A review of maintenance service for leasing equipment
Abstract
Full Text:
PDFReferences
Chang WL, Lo H-C. Joint determination of lease period and preventive maintenance policy for leased equipment with residual value. Comput Ind Eng. 2011 Oct 1;61(3):489–96.
Yeh RH, Chang WL. Optimal threshold value of failure-rate for leased products with preventive maintenance actions. Math Comput Model. 2007 Sep 1;46(5–6):730–7.
Mobley RK. An introduction to predictive maintenance. New York NY: Van Nostrand Reinhold; 1990. 189 p.
Parida A, Kumar U. Maintenance Productivity and Performance Measurement. In: Handbook of Maintenance Management and Engineering. London: Springer London; 2009. p. 17–41.
Garg A, Deshmukh SG. Maintenance management: literature review and directions. J Qual Maint Eng. 2006 Jul 12;12(3):205–38.
Simões JM, Gomes CF, Yasin MM. A literature review of maintenance performance measurement. J Qual Maint Eng. 2011 May 31;17(2):116–37.
Ding S-H, Kamaruddin S. Maintenance policy optimization—literature review and directions. Int J Adv Manuf Technol. 2015 Feb 16;76(5–8):1263–83.
Pongpech J, Murthy DNP. Optimal periodic preventive maintenance policy for leased equipment. Reliab Eng Syst Saf. 2006 Jul 1;91(7):772–7.
Jaturonnatee J, Murthy DNP, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs. Eur J Oper Res. 2006 Oct 1;174(1):201–15.
Yeh RH, Kao K-C, Chang WL. Optimal preventive maintenance policy for leased equipment using failure rate reduction. Comput Ind Eng. 2009 Aug 1;57(1):304–9.
Yeh RH, Chang WL, Lo H-C. Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age. Math Comput Model. 2011 Nov 1;54(9–10):2014–9.
Schutz J, Rezg N. Maintenance strategy for leased equipment. Comput Ind Eng. 2013 Nov 1;66(3):593–600.
Zhou X, Li Y, Xi L, Lee J. Multi-phase preventive maintenance policy for leased equipment. Int J Prod Res. 2015 Aug 3;53(15):4528–37.
Ben Mabrouk A, Chelbi A, Radhoui M. Optimal imperfect maintenance strategy for leased equipment. Int J Prod Econ. 2016 Aug 1;178:57–64.
Nakagawa T. A summary of periodic replacement with minimal repair at failure. J Oper Res Soc Japan. 1981;24(3):213–27.
Jack N, Murthy DNP. A flexible extended warranty and related optimal strategies. J Oper Res Soc. 2007 Dec 21;58(12):1612–20.
Chang WL, Lin J-H. Optimal maintenance policy and length of extended warranty within the life cycle of products. Comput Math with Appl. 2012 Jan 1;63(1):144–50.
DOI: http://dx.doi.org/10.12962/j23546026.y2018i3.3727
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.