Selection Alternative Electrical System Design at Property Mall, a Case in Ciputra World Surabaya Phase 3
Abstract
Keywords
Full Text:
PDFReferences
S. Sesmiwati, V. Ariani, and F. Roza, “Review penyebab keterlambatan pada proyek konstruksi,” in Seminar Nasional Strategi Pengembangan Infrastruktur ke-3 (SPI-3), 2017, pp. 15–22.
D. F. Fuadie, “Analisis faktor penyebab dan dampak kesalahan desain pada proyek-proyek di PT. Pertamina MOR V,” Institut Teknologi Sepuluh Nopember, 2017.
Jufrizel Jufrizel and M. Irfan, “Perencanaan teknis dan ekonomis pembangkit listrik tenaga surya sistem on – grid,” in Seminar Nasional Teknologi Informasi, Komunikasi dan Industri (SNTIKI) 9, 2017.
C. Utomo and A. Idrus, “Value-based group decision support bridge selection,” Int. J. Econ. Manag. Eng., vol. 4, no. 7, pp. 1688–1693, 2010.
C. Utomo, A. Idrus, A. Nugraheni, and Rahmawati Farida, “Negotiation support for value–based decision in construction,” Int. J. Econ. Manag. Eng., vol. 5, no. 7, p. 2001, 2011.
I. Amriadi, “Optimasi bahan bakar pada pembangkit listrik PT CPI dengan metode linear programming,” Institut Teknologi Sepuluh Nopember, 2013.
K. F. Fong and C. K. Lee, “Performance analysis of internal-combustion-engine primed trigeneration systems for use in high-rise office buildings in Hong Kong,” Appl. Energy, vol. 160, pp. 793–801, Dec. 2015.
M. F. Pasaribu and R. Puspita, “Tahap informasi, kreatif, dan analisa pada rekayasa nilai untuk meningkatkan kualitas pelayanan hotel,” Ind. Eng. J., vol. 5, no. 2, Nov. 2016.
C. Utomo, A. Idrus, M. Napiah, and M. F. Khamidi, “Aggregation and coalition formation on value-based decision,” in 2009 IEEE Symposium on Computational Intelligence in Milti-Criteria Decision-Making, 2009, pp. 118–125.
DOI: http://dx.doi.org/10.12962/j23546026.y2019i1.5101
Refbacks
- There are currently no refbacks.
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.