Selection Alternative Electrical System Design at Property Mall, a Case in Ciputra World Surabaya Phase 3

Nasychun Amin, Christiono Utomo

Abstract


A superblock area has a high complexity, both in the development process and later when it is operational, so it required the right design at the beginning. At project Ciputra World phase 3, especially on the electrical system (PLN combination with generator), required the selection of appropriate design. In determining the design which will be used there are several considerations, so the decision will be made is an alternative that has the highest value. The considerations in determining the design of this project are the Initial cost, Maintenance Cost, Energy Cost. Based on the background  above, the methodology to be used in determining the selection of the best design for the electrical system in Ciputra World phase 3 is a Life Cycle Cost Analysis, where the costs of each alternative will be compared. The results of research show Cost of alternative 1 about IDR 570 billion (1 PLN – Diesel Engine), Alternative 2 about IDR 555 billion (1 PLN – Diesel Engine – Gas Engine) and Alternative 3 about IDR 580 billions (2 PLN -  Gas Engine). The best alternative design based on LCC is alternative 2 (1 PLN – Diesel Engine - Gas Engine)

Keywords


life cycle cost; alternative; electrical system

Full Text:

PDF

References


S. Sesmiwati, V. Ariani, and F. Roza, “Review penyebab keterlambatan pada proyek konstruksi,” in Seminar Nasional Strategi Pengembangan Infrastruktur ke-3 (SPI-3), 2017, pp. 15–22.

D. F. Fuadie, “Analisis faktor penyebab dan dampak kesalahan desain pada proyek-proyek di PT. Pertamina MOR V,” Institut Teknologi Sepuluh Nopember, 2017.

Jufrizel Jufrizel and M. Irfan, “Perencanaan teknis dan ekonomis pembangkit listrik tenaga surya sistem on – grid,” in Seminar Nasional Teknologi Informasi, Komunikasi dan Industri (SNTIKI) 9, 2017.

C. Utomo and A. Idrus, “Value-based group decision support bridge selection,” Int. J. Econ. Manag. Eng., vol. 4, no. 7, pp. 1688–1693, 2010.

C. Utomo, A. Idrus, A. Nugraheni, and Rahmawati Farida, “Negotiation support for value–based decision in construction,” Int. J. Econ. Manag. Eng., vol. 5, no. 7, p. 2001, 2011.

I. Amriadi, “Optimasi bahan bakar pada pembangkit listrik PT CPI dengan metode linear programming,” Institut Teknologi Sepuluh Nopember, 2013.

K. F. Fong and C. K. Lee, “Performance analysis of internal-combustion-engine primed trigeneration systems for use in high-rise office buildings in Hong Kong,” Appl. Energy, vol. 160, pp. 793–801, Dec. 2015.

M. F. Pasaribu and R. Puspita, “Tahap informasi, kreatif, dan analisa pada rekayasa nilai untuk meningkatkan kualitas pelayanan hotel,” Ind. Eng. J., vol. 5, no. 2, Nov. 2016.

C. Utomo, A. Idrus, M. Napiah, and M. F. Khamidi, “Aggregation and coalition formation on value-based decision,” in 2009 IEEE Symposium on Computational Intelligence in Milti-Criteria Decision-Making, 2009, pp. 118–125.




DOI: http://dx.doi.org/10.12962/j23546026.y2019i1.5101

Refbacks

  • There are currently no refbacks.


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.