Improvement of Preventive Maintenance Process Effectiveness in Insourcing and Outsourcing Scheme with House of Risk (HOR) Method Approach (A Case Study)

Budi Siswanto, Adithya Sudiarno, Putu Dana Karningsih, Henry Pariaman

Abstract


Outsourcing has become the alternative scheme to gain improvement in several fields within a short time to many enterprises. One power generation in North Java implemented PM as planned maintenance strategy to maintain equipment by conducting insourcing and outsourcing scheme as PM execution. Both conditions must follow the same business process flow in PM execution process and there will occur some obstacles that interrupted PM process. The existing problem will be analyzed with House of Risk (HOR) method approach, supported by Integrated Manufacturing Open Systems Architecture (CIMOSA) process-based function modeling for identification method and Supply Chain Risk Identification System (SCRIS) risk structure identification used for mapping problem, root cause, and its relation. Analysis with HOR results in root causes that occurred within PM implementation process for both of them commonly has the same problem that is process business acknowledgment, but in outsourcing scheme not exist root cause on culture compliance and work task requirement, because they have a descriptive target to obtain service level agreement fulfillment. On both scheme still need an improving method to monitor and evaluate the PM work for better performance.

Keywords


CIMOSA; house of risk; preventive maintenance; corrective maintenance; power generation; risk; supply chain risk identification system; total productive maintenance

Full Text:

PDF

References


Tsang, A.H.C., Strategic Dimensions of Maintenance Management, Journal of Quality in Maintenance Engineering, Vol.8, Issue 1, pp.7-39, 2002.

Campbell, J.D., Jardine, A.K.S. and McGlynn, J., Asset Management Excellence - Optimizing Equipment Life-Cycle Decisions, Taylor & Francis Group, LLC., Florida, 2011.

Mobley, R.K., Higgins, L.R. and D.J.Wikoff , Maintenance Engineering Handbook, 7th Edition, Mc Graw Hill, New York, 2008.

Wienker, M., Henderson, K. and Volkerts, J., The Computerized Maintenance Management System An essential Tool for World Class Maintenance, 3rd International Symposium on Innovation and Technology in the Phosphate Industry, Procedia Engineering 138 (2016) pp.413–420.

Ben-Daya, M., Duffuaa, S.O., Raouf A., Knezevic, J. and Ait-Kadi, D., Handbook of Maintenance and Engineering, Springer-Verlag, London, 2009.

Levitt, J., Maintenance Management, 2nd Edition, Industrial Press, Inc. New York, 2009.

Muchiri P.N., Pintelon, L., Martin, H. and De Meyer, A.M., Empirical analysis of maintenance performance measurement in Belgian, International Journal of Production Research, Vol.48, No.20 (2009) pp.5905–5924.

Sari, E., Shaharoun, A.M., Ma’aram, A. and Yazid, A.M., Sustainable Maintenance Performance Measures: a pilot survey in Malaysian Automotive Companies, Procedia CIRP 26 (2015) pp.443 – 448.

Siswanto, B., Sudiarno, A., Karningsih, P.D., Improvement of Preventive Maintenance Process Implementation Effectiveness with House of Risk (HOR) Method Approach, ITES International Conference (2018) (will be held in August 1-2th 2018)

Imam, S. F., Raza J. and Chandima Ratnayake, R.M., World Class Maintenance (WCM): Measurable indicators creating Opportunities for the Norwegian Oil and Gas industry, Conference Paper · December 2013, Research gate (2018)

Dombrowski, U. and Mielke T., Lean Leadership – 15 Rules for a sustainable Lean Implementation, Proceedings of the 47th CIRP Conference on Manufacturing Systems, Procedia CIRP 17 (2014) pp.565 – 570.

Giustiniano, L. and Clarioni, G., The Impact of Outsourcing on Business Performance: An Empirical Analysis, Journal of Modern Accounting and Auditing, ISSN 1548-6583, Vol. 9, No. 2 (2013) 153-168.

Murthy, D.N.P., Karim, M.R., Ahmadi A., Data management in Maintenance Outsourcing, Reliability Engineering & System Safety Volume 142 (2015) Pages 100-110.

Meier, H., Lagemann, H., Morlock, F. and Rathmann, C, Key Performance Indicators for Assessing the Planning and Delivery of Industrial Services, 2nd International Through-life Engineering Services Conference, Procedia CIRP 11 (2013) pp.99–104

Ariratana, W., Sirisookslip, S. and Ngang, T.K., Development of Leadership Soft Skills Among Educational, Procedia - Social and Behavioral Sciences 186 (2015) 331 – 336.

Attakorn, K., Tayut, T., Pisitthawat, K. and Kanokorn, S., Soft Skills of New Teachers in the Secondary Schools of Khon Kaen Secondary Educational Service Area 25, Thailand”, International Conference on Education & Educational Psychology 2013 (ICEEPSY 2013), Procedia - Social and Behavioral Sciences 112 (2014) pp.1010 – 1013.

15 Koot, W., Anthropology of - Organizational Culture. International Encyclopedia of the Social & Behavioral Sciences (2001) pp.10934–10938.

Hitka, M., Vetráková, M., Balážová, Z. and Danihelová, Z, Corporate Culture as a Tool for Competitiveness Improvement, Business Economics and Management 2015 Conference, Procedia Economics and Finance 34 (2015) pp.27 – 34

Ibrahim, I., Boerhannoeddin, A. and Kayode, B.K. Organizational Culture and Development: Testing the Structural Path of Factors Affecting Employees’ Work Performance in an Organization, Asia Pacific Management Review 22 (2017) pp.104-111

Tucker, A.L. and Singer A.J. The Effectiveness of Management-By-Walking- Around: A Randomized Field Study, Working Paper 12-113, Agency for Healthcare Research and Quality RO1 HSO13920, 2013

Dombrowski, U. and Mielke T., Lean Leadership fundamental principles and their application, Forty-Sixth CIRP Conference on Manufacturing Systems, Procedia CIRP 7 (2013) pp.569 – 574.

Murthy, D.N.P., Atrens, A. and Eccleston J.A Strategic maintenance management, Journal of Quality in Maintenance Engineering, Vol. 8 Issue: 4 (2002) pp.287-305.

Coetzee, J.L., A Holistic Approach to The Maintenance “Problem“, Journal of Quality in Maintenance Engineering, Vol.6, Issue 3 (1999) pp.138-164.

Pujawan, I.N. and Geraldin, L.H, House of Risk: A Model for Proactive Supply Chain Risk Management, Bussiness Process Management Journal, Vol.15, No.2 (2009) pp.963-967.

Kosanke, K., Vernadat, F. and Zelm, M., Means to enable Enterprise Interoperation: CIMOSA Object Capability Profiles and CIMOSA Collaboration View, Proceedings of the 19th World Congress The International Federation of Automatic Control, August, 24-29 (2014) Cape Town, South Africa.

Heulluy, B. and Vernadat, F.B., The CIMOSA Enterprise Modelling Ontology, IFAC Manufacturing Systems: Modelling, Management and Control (1997) Vienna, Austria.

Kosanke, K., and Vernadat F., CIMOSA and GERAM Standardisation in Enterprise Engineering”, IFAC Information Control in Manufacturing (1998) Nancy-Metz, France

Berio, G. And Vernadat, F., Enterprise modelling with CIMOSA: functional and organizational aspects, Production Planning & Control, Vol. 12, No. 2 (2001) 128-136.

Karningsih, P.D. and Kayis, B., SCRIS: A Knowledge-Based System Tool for Assisting Manufacturing Organizations in Identifying Supply Chain Risks, Journal of Manufacturing Technology Management, Vol. 23, No. 7 (2011) pp.834-852.




DOI: http://dx.doi.org/10.12962/j20882033.v30i2.5010

Refbacks

  • There are currently no refbacks.


Creative Commons License

IPTEK Journal of Science and Technology by Lembaga Penelitian dan Pengabdian kepada Masyarakat, ITS is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://iptek.its.ac.id/index.php/jts.