Analysis of Quality Improvement of Finishing Work in The Development of Puncak CBD Surabaya Apartment
Abstract
Keywords
Full Text:
PDFReferences
D. Ashokkumar, “Study of quality management in construction industry,” Int. J. Innov. Res. Sci. Eng. Technol., pp. 36–43, 2014.
H. Gunaydin, “TQM in the Construction Industry,” 1995.
H. Ardhan and et al, “Evaluasi Pengerjaan Ulang (Rework) Pada Proyek Konstruksi Gedung Di Semarang,” J. Karya Tek. Sipil, pp. 93–106, 2015.
W. Ledbetter, “The quality performance management system: a blue print for implementation,” Austin, 1990.
K. Peter and F. Natassasanti, “Asesmen Kualitas Komponen Arsitektural TIGA Gedung Perkantoran di Yogyakarta dengan Prinsip - Prinsip CONQUAS dan Six Sigma,” 2018.
W. Kristanto, “Defect Analysis of Building Construction Works Building in Surabaya with Six Sigma Methode.,” Int. J. Innov. Sci. Reaserch Technol., 2018.
L. Yusuf and et al, “Penerapan Pendekatan Metode Six Sigma Dalam Penjagaan Kualitas Pada Proyek Konstruksi,” Makara Teknol., pp. 67–72, 2009.
Heizer and Render, Operation Management: Sustainability and Supply Chain Management. Jakarta: Salemba Empat, 2015.
V. Gaspersz, Total Quality Management. Jakarta: PT. Gramedia Pustaka Utama, 2002.
H. Ferdian and et al, “Penerapan Metode DMAIC dalam Peningkatan Acceptance Rate Untuk Ukuran Panjang Produk Bushing,” ComTech, vol. 3, pp. 938–995, 2012.
DOI: http://dx.doi.org/10.12962/j20882033.v30i3.5509
Refbacks
- There are currently no refbacks.
IPTEK Journal of Science and Technology by Lembaga Penelitian dan Pengabdian kepada Masyarakat, ITS is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on a work at https://iptek.its.ac.id/index.php/jts.