No 3 (2020)

International Conference on Management of Technology, Innovation, and Project (MOTIP) 2020

Table of Contents

Articles

Analysis Quality Improvement of Structural Work in Ciputra World Surabaya Project 3 PDF
Arif Rahman Hakim, I Putu Artama Wiguna 1-5
Determination Program Priority by Applying Variance Analysis Method in Controlling Electricity Main Supply Cost PDF
Danang Mustika Widya, Bambang Syairudin 6-10
The Risk Assessment of Genset Installation Project Using Fault Tree Analysis In Indonesia PDF
Akhmad Khilmy, Mohammad Isa Irawan, Berlian Rahmy Lidiawaty 11-17
Development of Effective Risk Mitigation Strategy for Cell Culture Process of Recombinant Protein Production PDF
Yuanita Kumala Dewi, Putu Dana Karningsih 18-23
Analysis of Factors Affecting Operator Performance with Partial Least Square Approach PDF
Tommy Ivantoro, Bambang Syairudin 24-30
Evaluation of Human Resource Information System by Using HOT-Fit Model PDF
Nindya Agustin Widiastuti, Sri Gunani Partiwi 31-37
Waste Reduction in Electrical Production Process in PT Petrokimia Gresik Coal Utility Using Value Stream Mapping and FMEA Applications PDF
Rosyid Ridlo, Mokh. Suef 38-42
Optimization of Gas Turbine Component Maintenance to Improve Reliability of Power Plant Industries PDF
Doni Ardhi Dharmawan, Mokh. Suef 43-47
Risk Analysis of Community Based Infrastructure Grant Program PDF
Muhammad Ermando Nurman Sasono, Mohammad Arif Rohman 48-53
Designing a Master Program to Cope with the New and Next Normal (VUCA World, Industry 4.0, and Covid 19): a case study PDF
Gembong Baskoro 54-57
Analysis of Root Causes of Fire in Coal Fired Power Plant Using FMEA Study Case Method at PT. PJB UBJOM PACITAN PDF
Muchamad Jati Nugroho, M. Isa Irawan 58-63
Simulation of In Bag Fertilizer Loading Process In Port of Petrokimia Gresik to Increase Loading Rate PDF
Bagusranu Wahyudi Putra, I Nyoman Pujawan 64-71
Re-Design Layout and Allocation of Raw Material Warehouses Using Simulation Methods to Minimize the Handling Cost from Port to Warehouses PDF
Boy Cahyo Prihanto, I Nyoman Pujawan 72-80
Improving the Quality of Palm Oil NPK Fertilizer Products at PT.XYZ Using Statistical Process Control Methods and Taguchi Experiment PDF
Hariono Hariono, Mokh. Suef 81-86
Quality Improvement of Instrument Transformer Using Taguchi Experiment Method in PT. XYZ PDF
Ziyaurrohman Alladany, Mokh. Suef 87-92
Integrated Modelling of In-Bag Fertilizer Handling Process and Forklift Needs to Reduce Waste in Sales Warehouses of PT Petrokimia Gresik PDF
Bachtiar Rosihan Aghda, Nurhadi Siswanto 93-97
Risk Analysis and Mitigation in the Procurement Process of Overhaul Services PDF
Adinda Sushmita Dewanti, Putu Dana Karningsih 98-103
Mixed Integer Linear Programming as a Method for Evaluation of Location and Number of Buffer Warehouse in PT Petrokimia Gresik Distribution System (Case Study: West Java and Central Java) PDF
Iwan Febrianto, Nurhadi Siswanto 104-109
Highest and Best Use for Mall’s Motorcycle Parking Area Surabaya PDF
Rafael Dani Kusuma, Christiono Utomo 110-115
Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation PDF
Masyiakh K. Dendy, Fadil P. Satria, Shu-Chiang Lin 116-118
A Case Study of Applying Customer Segmentation in A Medical Equipment Industry PDF
Iqbal Grady Favian, Erma Suryani 119-125
Determination of Optimum Point of Composition of Fuel Calories in Producing electrical Energy in Coal Fired Power Plant PDF
Jonathan Dian, Wahyu Wibowo 126-132
Modeling Priority Maintenance Cost Based on Top-Down and Bottom-Up Approach with Reconciliation of Forum Group Discussion PDF
Mohammad Fauzan, Bambang Syairudin 133-139
The Distribution of Damage to District Roads in Karang Penag Sub-District in Sampang District Uses Pavement Condition Index (PCI) and Spatial Poisson Point Process (SPPP) PDF
Sulhan Sulhan, Nur Iriawan, Ervina Ahyudanari 140-145
Implementation of Risk Management for Coal Switching in Coal Fired Steam Power Plant PDF
Luthfi Yulian Fikri, Suparno Suparno 146-152
The Effect of Financial Incentives, Organizational Commitment, and Job Satisfaction on Employee Performance PDF
Doddy Firman Rahmadi, Sri Gunani Partiwi 153-159
Product Quality Improvement in the Assembly Process of the 5.56 mm Ammunitions (Variant MU5-TJ) at PT.X Using the Six Sigma Method PDF
Ratna Sari Trisna Wardani, Mokhamad Suef 160-167
Distribution Network Configuration of Drilling Material to Reduce Transportation Cost PDF
Maykel Yonathan, I Nyoman Pujawan 168-174
Quality Improvement Program for Colocation Data Center Services Using Quality Function Deployment (QFD) PDF
Jiyi Nur Fauzan, Moses Laksono Singgih 175-180
Reliability Analysis and Economic Life Calculation for Asset Management Optimization (Case Study in Steam Power Generation Unit at XYZCompany) PDF
Gede Bayu Anugrah, Mokhamad Suef 181-189
Goal Prgramming Approach in Determining Production and Delivery Decision from Two Factories PDF
Anis Rostika Sari, I Nyoman Pujawan 190-195
IRR Incremental Analysis of Fuel Facility Construction Projects - Juanda Airport Terminal 2 PDF
Dimas Bagus Satriyo Wibowo, Ervina Ahyudanari 196-204
Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling PDF
Alivia Rosy Walidonna, Iwan Vanany 205-208
Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation PDF
Edi Supriyono, Ervina Ahyudanari 209-213
Oil Prices Sensitivity to The Power Supply Procurement Project at PT PEP Sukowati PDF
M. Agus Pangestu, Christiono Utomo, Ervina Ahyudanari 214-218
Factors That Influence Behavior Intention of Z Generation in Choosing Products of Cellular Telecommunication Services PDF
Ardi W. Alfan, Fadil P. Satria, Shu-Chiang Lin 219-222
Strategic Analysis on Start-Up Business Using Objectives and Key Results Method in Rumah Kapas Holding PDF
Bassam Muhammad Drehem, Iwan Vanany 223-227
Optimization Telecommunications Infrastructure Projects for University Area PDF
Supriyanto Supriyanto, Ervina Ahyudanari, Febriliyan Samopa 228-232
Inventory Planning for XYZ Mart using EOQ and Monte Carlo PDF
Muhammad Fadhil, Erma Suryani 233-237
Inventory Planning for XYZ Mart using EOQ and Monte Carlo PDF
Muhammad Fadhil, Erma Suryani 238-237
Prioritization of Urea Fertilizer 4Ps Marketing Mix: A Case Study PDF
Hana Fathia Izazi, Bustanul Airifin Noer 244-248
Work Efficiency Improvement in the Bidding Process PDF
Diana F. Kelasworoningrum, Moses Laksono Singgih 249-254
Social Resilience Assessment in Reducing Potential Risk of Earthquake in Surabaya PDF
Myrna Augusta Aditya Dewi, Mohammad Arif Rohman, Eko Budi Santoso 255-263
3 Kg LPG Business Strategy Development Using BMC and BOS PDF
Luqman Hanifianto, Bustanul Arifin Noer 264-268
General Bank's Profitability Analysis on The Impact of Going Public Process PDF
Karina Buditianingsih, I Ketut Gunarta 269-272
Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method PDF
Ika Syarah Firmansyah, Suparno Suparno 273-278
Quality Improvement of Overhaul Maintenance Service using Servqual and Quality Function Deployment Method Case Study in PT. Pembangkitan Jawa Bali (PJB) UPHT Gresik PDF
Adi Suryadarma, Moses Laksono Singgih 279-283
Nurse Scheduling Optimation with Various Assignment Pattern at ABC Hospital Using Goal Programming Method PDF
Sigit Ananda Murwato, Abdullah Shahab 284-287
The Alignment of Objectives Towards Benefits Perceived by Users and Empirical Impacts in The Implementation of E- Performance within Government Organizations PDF
Azmi Pratama, Tony Dwi Susanto 288-294
The Effectiveness of Indonesia’s Feed-in-Tariff Implementation to Improve Business Interest in Renewable Energy Case: The Simulation for Solar Farm in Weh Island (Aceh-Indonesia) PDF
Sri Rahmawati, Rudi Salam 295-299
Selection of Operation and Maintenance Stategic Partner Using AHP-VIKOR Model PDF
Maryono Maryono 300-306
A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant PDF
Hery Setiyawan, Udisubakti Ciptomulyono 307-313
Formulation Stategies for Vocational High School in Surabaya ( Case Study: SMKS “X”) PDF
Sucipto Limbong, I Putu Artama Wiguna 314-321
Risk Evaluation of The Use of The Umbrella Contract for The Construction Project for Medium Voltage Distribution in South Surabaya Region Using The Expected Monetary Value PDF
Irawan Dwi Purnomo, I Putu Artama Wiguna 322-325


View my Stat: Click Here

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.