Table of Contents
Articles
Analysis Quality Improvement of Structural Work in Ciputra World Surabaya Project 3 | |
Arif Rahman Hakim, I Putu Artama Wiguna | 1-5 |
Determination Program Priority by Applying Variance Analysis Method in Controlling Electricity Main Supply Cost | |
Danang Mustika Widya, Bambang Syairudin | 6-10 |
The Risk Assessment of Genset Installation Project Using Fault Tree Analysis In Indonesia | |
Akhmad Khilmy, Mohammad Isa Irawan, Berlian Rahmy Lidiawaty | 11-17 |
Development of Effective Risk Mitigation Strategy for Cell Culture Process of Recombinant Protein Production | |
Yuanita Kumala Dewi, Putu Dana Karningsih | 18-23 |
Analysis of Factors Affecting Operator Performance with Partial Least Square Approach | |
Tommy Ivantoro, Bambang Syairudin | 24-30 |
Evaluation of Human Resource Information System by Using HOT-Fit Model | |
Nindya Agustin Widiastuti, Sri Gunani Partiwi | 31-37 |
Waste Reduction in Electrical Production Process in PT Petrokimia Gresik Coal Utility Using Value Stream Mapping and FMEA Applications | |
Rosyid Ridlo, Mokh. Suef | 38-42 |
Optimization of Gas Turbine Component Maintenance to Improve Reliability of Power Plant Industries | |
Doni Ardhi Dharmawan, Mokh. Suef | 43-47 |
Risk Analysis of Community Based Infrastructure Grant Program | |
Muhammad Ermando Nurman Sasono, Mohammad Arif Rohman | 48-53 |
Designing a Master Program to Cope with the New and Next Normal (VUCA World, Industry 4.0, and Covid 19): a case study | |
Gembong Baskoro | 54-57 |
Analysis of Root Causes of Fire in Coal Fired Power Plant Using FMEA Study Case Method at PT. PJB UBJOM PACITAN | |
Muchamad Jati Nugroho, M. Isa Irawan | 58-63 |
Simulation of In Bag Fertilizer Loading Process In Port of Petrokimia Gresik to Increase Loading Rate | |
Bagusranu Wahyudi Putra, I Nyoman Pujawan | 64-71 |
Re-Design Layout and Allocation of Raw Material Warehouses Using Simulation Methods to Minimize the Handling Cost from Port to Warehouses | |
Boy Cahyo Prihanto, I Nyoman Pujawan | 72-80 |
Improving the Quality of Palm Oil NPK Fertilizer Products at PT.XYZ Using Statistical Process Control Methods and Taguchi Experiment | |
Hariono Hariono, Mokh. Suef | 81-86 |
Quality Improvement of Instrument Transformer Using Taguchi Experiment Method in PT. XYZ | |
Ziyaurrohman Alladany, Mokh. Suef | 87-92 |
Integrated Modelling of In-Bag Fertilizer Handling Process and Forklift Needs to Reduce Waste in Sales Warehouses of PT Petrokimia Gresik | |
Bachtiar Rosihan Aghda, Nurhadi Siswanto | 93-97 |
Risk Analysis and Mitigation in the Procurement Process of Overhaul Services | |
Adinda Sushmita Dewanti, Putu Dana Karningsih | 98-103 |
Highest and Best Use for Mall’s Motorcycle Parking Area Surabaya | |
Rafael Dani Kusuma, Christiono Utomo | 110-115 |
Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation | |
Masyiakh K. Dendy, Fadil P. Satria, Shu-Chiang Lin | 116-118 |
A Case Study of Applying Customer Segmentation in A Medical Equipment Industry | |
Iqbal Grady Favian, Erma Suryani | 119-125 |
Determination of Optimum Point of Composition of Fuel Calories in Producing electrical Energy in Coal Fired Power Plant | |
Jonathan Dian, Wahyu Wibowo | 126-132 |
Modeling Priority Maintenance Cost Based on Top-Down and Bottom-Up Approach with Reconciliation of Forum Group Discussion | |
Mohammad Fauzan, Bambang Syairudin | 133-139 |
The Distribution of Damage to District Roads in Karang Penag Sub-District in Sampang District Uses Pavement Condition Index (PCI) and Spatial Poisson Point Process (SPPP) | |
Sulhan Sulhan, Nur Iriawan, Ervina Ahyudanari | 140-145 |
Implementation of Risk Management for Coal Switching in Coal Fired Steam Power Plant | |
Luthfi Yulian Fikri, Suparno Suparno | 146-152 |
The Effect of Financial Incentives, Organizational Commitment, and Job Satisfaction on Employee Performance | |
Doddy Firman Rahmadi, Sri Gunani Partiwi | 153-159 |
Product Quality Improvement in the Assembly Process of the 5.56 mm Ammunitions (Variant MU5-TJ) at PT.X Using the Six Sigma Method | |
Ratna Sari Trisna Wardani, Mokhamad Suef | 160-167 |
Distribution Network Configuration of Drilling Material to Reduce Transportation Cost | |
Maykel Yonathan, I Nyoman Pujawan | 168-174 |
Quality Improvement Program for Colocation Data Center Services Using Quality Function Deployment (QFD) | |
Jiyi Nur Fauzan, Moses Laksono Singgih | 175-180 |
Reliability Analysis and Economic Life Calculation for Asset Management Optimization (Case Study in Steam Power Generation Unit at XYZCompany) | |
Gede Bayu Anugrah, Mokhamad Suef | 181-189 |
Goal Prgramming Approach in Determining Production and Delivery Decision from Two Factories | |
Anis Rostika Sari, I Nyoman Pujawan | 190-195 |
IRR Incremental Analysis of Fuel Facility Construction Projects - Juanda Airport Terminal 2 | |
Dimas Bagus Satriyo Wibowo, Ervina Ahyudanari | 196-204 |
Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling | |
Alivia Rosy Walidonna, Iwan Vanany | 205-208 |
Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation | |
Edi Supriyono, Ervina Ahyudanari | 209-213 |
Oil Prices Sensitivity to The Power Supply Procurement Project at PT PEP Sukowati | |
M. Agus Pangestu, Christiono Utomo, Ervina Ahyudanari | 214-218 |
Factors That Influence Behavior Intention of Z Generation in Choosing Products of Cellular Telecommunication Services | |
Ardi W. Alfan, Fadil P. Satria, Shu-Chiang Lin | 219-222 |
Strategic Analysis on Start-Up Business Using Objectives and Key Results Method in Rumah Kapas Holding | |
Bassam Muhammad Drehem, Iwan Vanany | 223-227 |
Optimization Telecommunications Infrastructure Projects for University Area | |
Supriyanto Supriyanto, Ervina Ahyudanari, Febriliyan Samopa | 228-232 |
Inventory Planning for XYZ Mart using EOQ and Monte Carlo | |
Muhammad Fadhil, Erma Suryani | 233-237 |
Inventory Planning for XYZ Mart using EOQ and Monte Carlo | |
Muhammad Fadhil, Erma Suryani | 238-237 |
Prioritization of Urea Fertilizer 4Ps Marketing Mix: A Case Study | |
Hana Fathia Izazi, Bustanul Airifin Noer | 244-248 |
Work Efficiency Improvement in the Bidding Process | |
Diana F. Kelasworoningrum, Moses Laksono Singgih | 249-254 |
Social Resilience Assessment in Reducing Potential Risk of Earthquake in Surabaya | |
Myrna Augusta Aditya Dewi, Mohammad Arif Rohman, Eko Budi Santoso | 255-263 |
3 Kg LPG Business Strategy Development Using BMC and BOS | |
Luqman Hanifianto, Bustanul Arifin Noer | 264-268 |
General Bank's Profitability Analysis on The Impact of Going Public Process | |
Karina Buditianingsih, I Ketut Gunarta | 269-272 |
Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method | |
Ika Syarah Firmansyah, Suparno Suparno | 273-278 |
Quality Improvement of Overhaul Maintenance Service using Servqual and Quality Function Deployment Method Case Study in PT. Pembangkitan Jawa Bali (PJB) UPHT Gresik | |
Adi Suryadarma, Moses Laksono Singgih | 279-283 |
Nurse Scheduling Optimation with Various Assignment Pattern at ABC Hospital Using Goal Programming Method | |
Sigit Ananda Murwato, Abdullah Shahab | 284-287 |
The Alignment of Objectives Towards Benefits Perceived by Users and Empirical Impacts in The Implementation of E- Performance within Government Organizations | |
Azmi Pratama, Tony Dwi Susanto | 288-294 |
Selection of Operation and Maintenance Stategic Partner Using AHP-VIKOR Model | |
Maryono Maryono | 300-306 |
A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant | |
Hery Setiyawan, Udisubakti Ciptomulyono | 307-313 |
Formulation Stategies for Vocational High School in Surabaya ( Case Study: SMKS “X”) | |
Sucipto Limbong, I Putu Artama Wiguna | 314-321 |
Risk Evaluation of The Use of The Umbrella Contract for The Construction Project for Medium Voltage Distribution in South Surabaya Region Using The Expected Monetary Value | |
Irawan Dwi Purnomo, I Putu Artama Wiguna | 322-325 |
View my Stat: Click Here
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.