Table of Contents
Articles
| Analysis Quality Improvement of Structural Work in Ciputra World Surabaya Project 3 | |
| Arif Rahman Hakim, I Putu Artama Wiguna | 1-5 |
| Determination Program Priority by Applying Variance Analysis Method in Controlling Electricity Main Supply Cost | |
| Danang Mustika Widya, Bambang Syairudin | 6-10 |
| The Risk Assessment of Genset Installation Project Using Fault Tree Analysis In Indonesia | |
| Akhmad Khilmy, Mohammad Isa Irawan, Berlian Rahmy Lidiawaty | 11-17 |
| Development of Effective Risk Mitigation Strategy for Cell Culture Process of Recombinant Protein Production | |
| Yuanita Kumala Dewi, Putu Dana Karningsih | 18-23 |
| Analysis of Factors Affecting Operator Performance with Partial Least Square Approach | |
| Tommy Ivantoro, Bambang Syairudin | 24-30 |
| Evaluation of Human Resource Information System by Using HOT-Fit Model | |
| Nindya Agustin Widiastuti, Sri Gunani Partiwi | 31-37 |
| Waste Reduction in Electrical Production Process in PT Petrokimia Gresik Coal Utility Using Value Stream Mapping and FMEA Applications | |
| Rosyid Ridlo, Mokh. Suef | 38-42 |
| Optimization of Gas Turbine Component Maintenance to Improve Reliability of Power Plant Industries | |
| Doni Ardhi Dharmawan, Mokh. Suef | 43-47 |
| Risk Analysis of Community Based Infrastructure Grant Program | |
| Muhammad Ermando Nurman Sasono, Mohammad Arif Rohman | 48-53 |
| Designing a Master Program to Cope with the New and Next Normal (VUCA World, Industry 4.0, and Covid 19): a case study | |
| Gembong Baskoro | 54-57 |
| Analysis of Root Causes of Fire in Coal Fired Power Plant Using FMEA Study Case Method at PT. PJB UBJOM PACITAN | |
| Muchamad Jati Nugroho, M. Isa Irawan | 58-63 |
| Simulation of In Bag Fertilizer Loading Process In Port of Petrokimia Gresik to Increase Loading Rate | |
| Bagusranu Wahyudi Putra, I Nyoman Pujawan | 64-71 |
| Re-Design Layout and Allocation of Raw Material Warehouses Using Simulation Methods to Minimize the Handling Cost from Port to Warehouses | |
| Boy Cahyo Prihanto, I Nyoman Pujawan | 72-80 |
| Improving the Quality of Palm Oil NPK Fertilizer Products at PT.XYZ Using Statistical Process Control Methods and Taguchi Experiment | |
| Hariono Hariono, Mokh. Suef | 81-86 |
| Quality Improvement of Instrument Transformer Using Taguchi Experiment Method in PT. XYZ | |
| Ziyaurrohman Alladany, Mokh. Suef | 87-92 |
| Integrated Modelling of In-Bag Fertilizer Handling Process and Forklift Needs to Reduce Waste in Sales Warehouses of PT Petrokimia Gresik | |
| Bachtiar Rosihan Aghda, Nurhadi Siswanto | 93-97 |
| Risk Analysis and Mitigation in the Procurement Process of Overhaul Services | |
| Adinda Sushmita Dewanti, Putu Dana Karningsih | 98-103 |
| Highest and Best Use for Mall’s Motorcycle Parking Area Surabaya | |
| Rafael Dani Kusuma, Christiono Utomo | 110-115 |
| Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation | |
| Masyiakh K. Dendy, Fadil P. Satria, Shu-Chiang Lin | 116-118 |
| A Case Study of Applying Customer Segmentation in A Medical Equipment Industry | |
| Iqbal Grady Favian, Erma Suryani | 119-125 |
| Determination of Optimum Point of Composition of Fuel Calories in Producing electrical Energy in Coal Fired Power Plant | |
| Jonathan Dian, Wahyu Wibowo | 126-132 |
| Modeling Priority Maintenance Cost Based on Top-Down and Bottom-Up Approach with Reconciliation of Forum Group Discussion | |
| Mohammad Fauzan, Bambang Syairudin | 133-139 |
| The Distribution of Damage to District Roads in Karang Penag Sub-District in Sampang District Uses Pavement Condition Index (PCI) and Spatial Poisson Point Process (SPPP) | |
| Sulhan Sulhan, Nur Iriawan, Ervina Ahyudanari | 140-145 |
| Implementation of Risk Management for Coal Switching in Coal Fired Steam Power Plant | |
| Luthfi Yulian Fikri, Suparno Suparno | 146-152 |
| The Effect of Financial Incentives, Organizational Commitment, and Job Satisfaction on Employee Performance | |
| Doddy Firman Rahmadi, Sri Gunani Partiwi | 153-159 |
| Product Quality Improvement in the Assembly Process of the 5.56 mm Ammunitions (Variant MU5-TJ) at PT.X Using the Six Sigma Method | |
| Ratna Sari Trisna Wardani, Mokhamad Suef | 160-167 |
| Distribution Network Configuration of Drilling Material to Reduce Transportation Cost | |
| Maykel Yonathan, I Nyoman Pujawan | 168-174 |
| Quality Improvement Program for Colocation Data Center Services Using Quality Function Deployment (QFD) | |
| Jiyi Nur Fauzan, Moses Laksono Singgih | 175-180 |
| Reliability Analysis and Economic Life Calculation for Asset Management Optimization (Case Study in Steam Power Generation Unit at XYZCompany) | |
| Gede Bayu Anugrah, Mokhamad Suef | 181-189 |
| Goal Prgramming Approach in Determining Production and Delivery Decision from Two Factories | |
| Anis Rostika Sari, I Nyoman Pujawan | 190-195 |
| IRR Incremental Analysis of Fuel Facility Construction Projects - Juanda Airport Terminal 2 | |
| Dimas Bagus Satriyo Wibowo, Ervina Ahyudanari | 196-204 |
| Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling | |
| Alivia Rosy Walidonna, Iwan Vanany | 205-208 |
| Customer Loyalty Behaviour Brand Air Conditioner XYZ: Combination of Expectation- Confirmation Theory, Satisfaction – Loyalty, and Brand Reputation | |
| Edi Supriyono, Ervina Ahyudanari | 209-213 |
| Oil Prices Sensitivity to The Power Supply Procurement Project at PT PEP Sukowati | |
| M. Agus Pangestu, Christiono Utomo, Ervina Ahyudanari | 214-218 |
| Factors That Influence Behavior Intention of Z Generation in Choosing Products of Cellular Telecommunication Services | |
| Ardi W. Alfan, Fadil P. Satria, Shu-Chiang Lin | 219-222 |
| Strategic Analysis on Start-Up Business Using Objectives and Key Results Method in Rumah Kapas Holding | |
| Bassam Muhammad Drehem, Iwan Vanany | 223-227 |
| Optimization Telecommunications Infrastructure Projects for University Area | |
| Supriyanto Supriyanto, Ervina Ahyudanari, Febriliyan Samopa | 228-232 |
| Inventory Planning for XYZ Mart using EOQ and Monte Carlo | |
| Muhammad Fadhil, Erma Suryani | 233-237 |
| Inventory Planning for XYZ Mart using EOQ and Monte Carlo | |
| Muhammad Fadhil, Erma Suryani | 238-237 |
| Prioritization of Urea Fertilizer 4Ps Marketing Mix: A Case Study | |
| Hana Fathia Izazi, Bustanul Airifin Noer | 244-248 |
| Work Efficiency Improvement in the Bidding Process | |
| Diana F. Kelasworoningrum, Moses Laksono Singgih | 249-254 |
| Social Resilience Assessment in Reducing Potential Risk of Earthquake in Surabaya | |
| Myrna Augusta Aditya Dewi, Mohammad Arif Rohman, Eko Budi Santoso | 255-263 |
| 3 Kg LPG Business Strategy Development Using BMC and BOS | |
| Luqman Hanifianto, Bustanul Arifin Noer | 264-268 |
| General Bank's Profitability Analysis on The Impact of Going Public Process | |
| Karina Buditianingsih, I Ketut Gunarta | 269-272 |
| Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method | |
| Ika Syarah Firmansyah, Suparno Suparno | 273-278 |
| Quality Improvement of Overhaul Maintenance Service using Servqual and Quality Function Deployment Method Case Study in PT. Pembangkitan Jawa Bali (PJB) UPHT Gresik | |
| Adi Suryadarma, Moses Laksono Singgih | 279-283 |
| Nurse Scheduling Optimation with Various Assignment Pattern at ABC Hospital Using Goal Programming Method | |
| Sigit Ananda Murwato, Abdullah Shahab | 284-287 |
| The Alignment of Objectives Towards Benefits Perceived by Users and Empirical Impacts in The Implementation of E- Performance within Government Organizations | |
| Azmi Pratama, Tony Dwi Susanto | 288-294 |
| Selection of Operation and Maintenance Stategic Partner Using AHP-VIKOR Model | |
| Maryono Maryono | 300-306 |
| A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant | |
| Hery Setiyawan, Udisubakti Ciptomulyono | 307-313 |
| Formulation Stategies for Vocational High School in Surabaya ( Case Study: SMKS “X”) | |
| Sucipto Limbong, I Putu Artama Wiguna | 314-321 |
| Risk Evaluation of The Use of The Umbrella Contract for The Construction Project for Medium Voltage Distribution in South Surabaya Region Using The Expected Monetary Value | |
| Irawan Dwi Purnomo, I Putu Artama Wiguna | 322-325 |
View my Stat: Click Here

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.